Follow
Ali Alashwal
Ali Alashwal
School of Engineering, Design and Built Environment, Western Sydeny University
Verified email at westernsydney.edu.au
Title
Cited by
Cited by
Year
Knowledge sharing in a fragmented construction industry: On the hindsight
MA Ali, AR Hamzah, MB Abdul
Scientific Research and Essays 6 (7), 1530-1536, 2011
852011
Empirical study to determine fragmentation of construction projects
AM Alashwal, PSW Fong
Journal of Construction Engineering and Management 141 (7), 04015016, 2015
482015
Literature mapping: A bird’ s eye view on classification of factors influencing project success
AA Abdul, AR Hamzah, H Zakaria, MA Ali, MB Abdul
African Journal of Business Management 4 (19), 4174-4182, 2010
432010
Determining the relationship between conflict factors and performance of international construction projects
EZ Al-Sibaie, AM Alashwal, H Abdul-Rahman, UK Zolkafli
Engineering, Construction and Architectural Management, 2014
412014
Determining success criteria and success factors for international construction projects for Malaysian contractors
AM Alashwal, NF Fareed, KM Al-Obaidi
Construction Economics and Building 17 (2), 62-80, 2017
362017
Game analysis on prefabricated building evolution based on dynamic revenue risks in China
X Li, C Wang, A Alashwal, S Bora
Journal of Cleaner Production 267, 121730, 2020
292020
Abandoned housing projects in Malaysia: Pressing issues during the rehabilitation process
HA Rahman, AM Alashwal, M Ayub, AA Abdullah
ArchNet-IJAR: International Journal of Architectural Research 7 (1), 65, 2013
272013
Blockchain adoption in construction supply chain: A review of studies across multiple sectors
AA Hijazi, S Perera, A Alashwal, RN Calheiros
Proceedings of the CIB World Building Congress, Hong Kong, China, 17-21, 2019
222019
Using PLS-PM to model the process of inter-project learning in construction projects
AM Alashwal, H Abdul-Rahman
Automation in construction 44, 176-182, 2014
202014
Knowledge utilization process in highway construction projects
AM Alashwal, H Abdul-Rahman, J Radzi
Journal of Management in Engineering 32 (4), 05016006, 2016
192016
Simulation techniques for cost management and performance in construction projects in Malaysia
AM Alashwal, MY Chew
Built Environment Project and Asset Management, 2017
182017
Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group
AA Hijazi, S Perera, RN Calheiros, A Alashwal
Journal of construction engineering and management 147 (10), 03121005, 2021
162021
Exploring the barriers for implementing waste trading practices in the construction industry in Australia
S Ratnasabapathy, A Alashwal, S Perera
Built Environment Project and Asset Management, 2021
162021
Investigation of waste diversion rates in the construction and demolition sector in Australia
S Ratnasabapathy, A Alashwal, S Perera
Built Environment Project and Asset Management, 2020
162020
Risk factors in construction projects during unrest period in Yemen
AM Al-Ashwal, MH Al-Sabahi
Journal of Construction in Developing Countries, 43-62, 2018
152018
Aspects of project learning in construction: a socio-technical model
AM Alashwal, H Abdul-Rahman
Construction Innovation, 2014
142014
Enabling a single source of truth through BIM and blockchain integration
AA Hijazi, S Perera, AM Al-Ashwal, R Neves Calheiros
Proceedings of the 2019 International Conference on Innovation, Technology …, 2019
122019
Case study on BIM and value engineering integration for construction cost control
X Li, C Wang, A Alashwal
Advances in Civil Engineering 2021, 2021
112021
The roles of information and communication technology (ICT) systems in construction supply chain management and barriers to their implementation
D Rafikullah, S Hafez, MB Abdul, MA Ali, CA Bawa, AA Abdul
African Journal of Business Management 6 (7), 2403-2411, 2012
112012
Implementation and methods of project learning in quantity surveying firms: Barriers, enablers and success factors
H Abdul-Rahman, AM Alashwal, ZH Jamaludin
American Journal of Economics and Business Administration 3 (3), 430, 2011
112011
The system can't perform the operation now. Try again later.
Articles 1–20