Follow
Sang-Gui, Ha
Sang-Gui, Ha
Geotechnical Engineer
No verified email
Title
Cited by
Cited by
Year
Estimation method for TBM cutterhead drive design based on full-scale tunneling tests for application in utility tunnels
K Kim, J Kim, H Ryu, H Rehman, TH Jafri, H Yoo, S Ha
applied sciences 10 (15), 5187, 2020
202020
Feasible Boulder treatment methods for soft ground shielded TBM
WW Jee, S Ha
Undergr. Sp.–4th Dimens. Metropolises, 217-222, 2007
92007
Analysis of Mechanical Excavation Characteristics by Pre-Cutting Machine Based on Linear Cutting Tests
H Kim, S Ha, H Rehman, H Yoo
Applied Sciences 13 (2), 1205, 2023
42023
Expanded Longitudinal Deformation Profile in Tunnel Excavations Considering Rock Mass Conditions via 3D Numerical Analyses
S Ha, AM Naji, H Rehaman, K Nam, H Kim, J Park, H Yoo
Applied Sciences 11 (12), 5405, 2021
22021
Analysis of correlation between shield TBM construction field data and settlement measurement data
YR Jung, KM Nam, HE Kim, SG Ha, JS Yun, JE Cho, HK Yoo
Journal of Korean Tunnelling and Underground Space Association 24 (1), 79-94, 2022
12022
A numerical study on the behavior of existing and enlarged tunnels when widened by applying the pre-cutting method
HE Kim, KM Nam, SG Ha, HK Yoo
Journal of Korean Tunnelling and Underground Space Association 22 (4), 451-468, 2020
12020
Boulder Detection Methods and its Compensation for Obstruction in sonft Ground Tunnels by Shielded TBM
J Warren-Wangryul, H Sang-Gui
Journal of the Korean Society for Railway 9 (1), 110-117, 2006
2006
The system can't perform the operation now. Try again later.
Articles 1–7