Follow
Towhid Pourrostam
Towhid Pourrostam
Assistant Professor in Civil Engineering, Islamic Azad University, Tehran Central Branch
Verified email at iauctb.ac.ir - Homepage
Title
Cited by
Cited by
Year
Significant factors causing and effects of delay in Iranian construction projects
T Pourrostam, A Ismail
Australian Journal of Basic and Applied Sciences 5 (7), 450-456, 2011
1292011
Causes and effects of delay in Iranian construction projects
T Pourrostam, A Ismail
International Journal of Engineering and Technology 4 (5), 598, 2012
1132012
Factors causing variation orders and their effects in roadway construction projects
A Ismail, T Pourrostam, A Soleymanzadeh, M Ghouyounchizad
Research Journal of Applied Sciences, Engineering and Technology 4 (23 …, 2012
722012
Identification Success Factors in Minimizing Delays on Construction Projects in IAU-Shoushtar-Iran
TPA Ismail
Applied Mechanics and Materials 96 (pp 2189-2193, Scopus Index), 2011
28*2011
Identification and evaluation of causes and effects of change orders in building construction projects
T Pourrostam, A Ismail, M Mansournejad
Applied Mechanics and Materials 94, 2261-2264, 2011
192011
Study of methods for minimizing construction delays: Evidences from a developing country
T Pourrostam, A Ismail
Advanced Materials Research 201, 2939-2942, 2011
182011
Prediction and optimization of the flexural behavior of corroded concrete beams using adaptive neuro fuzzy inference system
J Peng, G Yan, Y Zandi, AS Agdas, T Pourrostam, IE El-Arab, N Denic, ...
Structures 43, 200-208, 2022
152022
Uncertainty management in time estimation of construction projects: A systematic literature review and new model development
A Naderpour, J Majrouhi Sardroud, M Mofid, Y Xenidis, T Pourrostam
Scientia Iranica 26 (2), 752-778, 2019
132019
Novel direction-of-arrival estimation techniques for periodic-sense local positioning systems
J Towhid Pourrostam, SA Zekavat, H Tong
2007 IEEE Radar Conference, 568-573, 2007
132007
Delays in the road construction projects from risk management perspective
R Mohajeri Borje Ghaleh, T Pourrostam, N Mansour Sharifloo, ...
Infrastructures 6 (9), 135, 2021
92021
Analyzing the energy performance of buildings by neuro-fuzzy logic based on different factors
KJMM Yan Cao, Towhid Pourrostam, Yousef Zandi, Nebojša Denić, Bogdan ...
Environment, Development and Sustainability, 2021
8*2021
Integrated model of value engineering and risk management approaches in empowerment projects (The exterior design)
TP Behrang Askari Sabzkohi
17th International Conference Civil and Architectural Engineering (ICCAE …, 2016
7*2016
Assessing the effect of building information modeling system (BIM) capabilities on lean construction performance in construction projects using hybrid fuzzy multi-criteria …
E Moballeghi, T Pourrostam, H Abbasianjahromi, P Makvandi
Iranian Journal of Science and Technology, Transactions of Civil Engineering …, 2023
52023
Dispute root causes and prevention in Iranian public-private partnership projects: a causal-predictive model
AM Mirzaee, T Pourrostam, J Majrouhi Sardroud, MR Hosseini, ...
Engineering, construction and architectural management 31 (1), 405-431, 2024
42024
Identification of Performance Evaluation Indicators for Health, Safety, Environment, and Ergonomics Management Systems
AGF Masoomeh Zeinalnezhad, Faezeh Sepehri, Mohammad Haji Molana, Towhid ...
Chemical Engineering Transactions 67, 2018
4*2018
Identification of performance evaluation indicators for health, safety, environment, and ergonomics management systems
M Zeinalnezhada, F Sepehrib, MH Molanab, T Pourrostam, AG Chofrehd, ...
CHEMICAL ENGINEERING 67, 2018
42018
Causes and Consequences of Job Stress in Construction Projects: Literature Review from 2000 Onwards,
TP Hamed Rashidian
10th International Conference on Civil and Architectural Engineering (ICCAE …, 2016
3*2016
Socio-economic consequences of traffic accidents in Iran
T Pourrostam, A Ismail
Australian Journal of Basic and Applied Sciences 5, 897-901, 2011
32011
Conceptual strategy of claims between stakeholders based on lifecycle in public-private partnership agreements (case study in Iran’s highway projects)
AM Mirzaee, T Pourrostam, J Majrouhi Sardroud
Journal of Improvement Management 13 (1), 153-182, 2019
22019
Benchmarking implementation in SMEs; A literature review and a research agenda
M Zeinalnzehad, S Sahran, M Mukhtar, T Pourrostam
The 11th Asia Pacific Industrial Engineering and Management Systems …, 2010
22010
The system can't perform the operation now. Try again later.
Articles 1–20