关注
Andrew J. Yu
标题
引用次数
引用次数
年份
Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA
AJ Yu, J Seif
Computers & Industrial Engineering 97, 26-40, 2016
752016
Planning and design models for construction industry: A critical survey
BR Sarker, PJ Egbelu, TW Liao, J Yu
Automation in Construction 22, 123-134, 2012
592012
Systems requirements engineering—State of the methodology
Y Bijan, J Yu, J Stracener, T Woods
Systems Engineering 16 (3), 267-276, 2013
562013
A multi-objective stochastic programming model for project-oriented human-resource management optimization
F Rahmanniyay, AJ Yu
International Journal of Management Science and Engineering Management 14 (4 …, 2019
402019
Directional decomposition heuristic for a linear machine-cell location problem
J Yu, BR Sarker
European Journal of Operational Research 149 (1), 142-184, 2003
392003
Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon
D Mungan, J Yu, BR Sarker
International Journal of Production Research 48 (12), 3619-3636, 2010
382010
A two-phase procedure for duplicating bottleneck machines in a linear layout, cellular manufacturing system
BR Sarker, J Yu
The International Journal of Production Research 32 (9), 2049-2066, 1994
381994
Single-manufacturer, multi-retailer consignment policy for retailers’ generalized demand distributions
J Yu, BR Sarker, Q Duan, B Wu
Journal of the Operational Research Society 63 (12), 1708-1719, 2012
342012
A multi-objective multi-stage stochastic model for project team formation under uncertainty in time requirements
F Rahmanniyay, AJ Yu, J Seif
Computers & Industrial Engineering 132, 153-165, 2019
292019
An inkjet-printed capacitive sensor for water level or quality monitoring: investigated theoretically and experimentally
Q Yang, JY Andrew, J Simonton, G Yang, Y Dohrmann, Z Kang, Y Li, J Mo, ...
Journal of materials chemistry A 5 (34), 17841-17847, 2017
292017
An integrated multi-stage supply chain inventory model under an infinite planning horizon and continuous price decrease
J Yu, D Mungan, BR Sarker
Computers & Industrial Engineering 61 (1), 118-130, 2011
292011
Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements
J Seif, AJ Yu, F Rahmanniyay
International Journal of Production Research 56 (9), 3204-3225, 2018
282018
Single machine common flow allowance group scheduling with learning effect and resource allocation
L Sun, AJ Yu, B Wu
Computers & Industrial Engineering 139, 106126, 2020
262020
Maximizing profit for vehicle routing under time and weight constraints
J Yu, Y Dong
International Journal of Production Economics 145 (2), 573-583, 2013
262013
Integrated preventive maintenance and flow shop scheduling under uncertainty
J Seif, M Dehghanimohammadabadi, AJ Yu
Flexible services and manufacturing journal 32, 852-887, 2020
232020
Procurement auctions and supply chain performance
M Jin, AJ Yu
International Journal of Production Economics 162, 192-200, 2015
192015
A numerical solution for a two-stage production and inventory system with random demand arrivals
AJ Yu, Y Dong
Computers & operations research 44, 13-21, 2014
192014
Configuration and operation architecture for dynamic cellular manufacturing product–service system
B Wu, S Fan, AJ Yu, L Xi
Journal of cleaner production 131, 716-727, 2016
172016
An extensive operations and maintenance planning problem with an efficient solution method
J Seif, JY Andrew
Computers & Operations Research 95, 151-162, 2018
162018
Incorporating a measure of uncertainty into systems of systems development performance measures
R Volkert, J Stracener, J Yu
Systems Engineering 17 (3), 297-312, 2014
122014
系统目前无法执行此操作,请稍后再试。
文章 1–20