Follow
Clyde Zhengdao Li
Clyde Zhengdao Li
Other namesZhengdao Li, 李政道
Verified email at szu.edu.cn
Title
Cited by
Cited by
Year
Critical review of the research on the management of prefabricated construction
Z Li, GQ Shen, X Xue
Habitat international 43, 240-249, 2014
4652014
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
J Hong, GQ Shen, Z Li, B Zhang, W Zhang
Journal of cleaner production 172, 649-660, 2018
4152018
An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction
CZ Li, F Xue, X Li, J Hong, GQ Shen
Automation in construction 89, 146-161, 2018
3662018
Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
CZ Li, J Hong, F Xue, GQ Shen, X Xu, MK Mok
Journal of cleaner production 134, 482-494, 2016
2732016
Critical factors in effective construction waste minimization at the design stage: a Shenzhen case study, China
J Wang, Z Li, VWY Tam
Resources, Conservation and Recycling 82, 1-7, 2014
2612014
Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model
J Hong, GQ Shen, C Mao, Z Li, K Li
Journal of cleaner production 112, 2198-2207, 2016
2532016
Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction
CZ Li, RY Zhong, F Xue, G Xu, K Chen, GG Huang, GQ Shen
Journal of cleaner production 165, 1048-1062, 2017
2492017
Unsupervised data analytics in mining big building operational data for energy efficiency enhancement: A review
C Fan, F Xiao, Z Li, J Wang
Energy and Buildings 159, 296-308, 2018
2152018
Measuring the impact of prefabrication on construction waste reduction: An empirical study in China
Z Li, GQ Shen, M Alshawi
Resources, conservation and recycling 91, 27-39, 2014
2112014
Identifying best design strategies for construction waste minimization
J Wang, Z Li, VWY Tam
Journal of cleaner production 92, 237-247, 2015
2052015
Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China
L Luo, C Mao, L Shen, Z Li
Engineering, Construction and Architectural Management 22 (6), 622-643, 2015
1782015
Managing social risks at the housing demolition stage of urban redevelopment projects: A stakeholder-oriented study using social network analysis
T Yu, GQ Shen, Q Shi, X Lai, CZ Li, K Xu
International journal of project management 35 (6), 925-941, 2017
1672017
SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong
CZ Li, J Hong, F Xue, GQ Shen, X Xu, L Luo
Habitat International 57, 74-87, 2016
1652016
A blockchain-and IoT-based smart product-service system for the sustainability of prefabricated housing construction
CZ Li, Z Chen, F Xue, XTR Kong, B Xiao, X Lai, Y Zhao
Journal of Cleaner Production 286, 125391, 2021
1542021
Investigating key challenges in major public engineering projects by a network-theory based analysis of stakeholder concerns: A case study
KY Mok, GQ Shen, RJ Yang, CZ Li
International Journal of Project Management 35 (1), 78-94, 2017
1452017
Research trend of the application of information technologies in construction and demolition waste management
CZ Li, Y Zhao, B Xiao, B Yu, VWY Tam, Z Chen, Y Ya
Journal of Cleaner Production 263, 121458, 2020
1412020
A novel methodology to explain and evaluate data-driven building energy performance models based on interpretable machine learning
C Fan, F Xiao, C Yan, C Liu, Z Li, J Wang
Applied Energy 235, 1551-1560, 2019
1332019
A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong
CZ Li, X Xu, GQ Shen, C Fan, X Li, J Hong
Journal of cleaner production 185, 366-381, 2018
992018
Supply chain management for prefabricated building projects in Hong Kong
L Luo, X Jin, GQ Shen, Y Wang, X Liang, X Li, CZ Li
Journal of management in engineering 36 (2), 05020001, 2020
982020
Schedule risk modeling in prefabrication housing production
CZ Li, GQ Shen, X Xu, F Xue, L Sommer, L Luo
Journal of Cleaner Production 153, 692-706, 2017
962017
The system can't perform the operation now. Try again later.
Articles 1–20