Xiao LI
Title
Cited by
Cited by
Year
A critical review of virtual and augmented reality (VR/AR) applications in construction safety
X Li, W Yi, HL Chi, X Wang, APC Chan
Automation in Construction 86 (c), 150-162, 2018
2582018
A state-of-the-art review on the integration of Building Information Modeling (BIM) and Geographic Information System (GIS)
X Liu, X Wang, G Wright, JCP Cheng, X Li, R Liu
ISPRS International Journal of Geo-Information 6 (2), 53, 2017
1562017
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
X Li, P Wu, GQ Shen, X Wang, Y Teng
Automation in Construction 84, 195-206, 2017
1252017
An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction
CZ Li, F Xue, X Li, J Hong, GQ Shen
Automation in construction 89, 146-161, 2018
1102018
RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production
X Li, GQ Shen, P Wu, H Fan, H Wu, Y Teng
Journal of Management in Engineering 34 (2), 2017
512017
Integrating Building Information Modeling and Prefabrication Housing Production
X Li, GQ Shen, P Wu, Y Teng
Automation in Construction 100, 46-60, 2019
432019
A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong
CZ Li, X Xu, GQ Shen, C Fan, X Li, J Hong
Journal of Cleaner Production 185, 366-381, 2018
412018
Overview of BIM maturity measurement tools
C Wu, B Xu, C Mao, X Li
Journal of Information Technology in Construction (ITcon) 22 (3), 34-62, 2017
392017
Using cooperative game theory to determine profit distribution in IPD projects
Y Teng, X Li, P Wu, X Wang
International Journal of Construction Management 19 (1), 32-45, 2019
322019
绿色 BIM 在国内建筑全生命周期应用前景分析 [J]
李骁
土木建筑工程信息技术 4 (2), 2012
172012
Supply Chain Management for Prefabricated Building Projects in Hong Kong
L Luo, X Jin, GQ Shen, Y Wang, X Liang, X Li, CZ Li
Journal of Management in Engineering 36 (2), 2020
72020
Foundation pit displacement monitoring and prediction using least squares support vector machines based on multi-point measurement
X Li, X Liu, CZ Li, Z Hu, GQ Shen, Z Huang
Structural Health Monitoring 18 (3), 715-724, 2019
72019
Modeling Constraints for the On-Site Assembly Process of Prefabrication Housing Production: A Social Network Analysis
P Gong, Y Teng, X Li, L Luo
Sustainability 11 (5), 1387, 2019
72019
Comparative research of AR and VR technology based on user experience
X Li, B Xu, Y Teng, Y Ren, Z Hu
2014 International Conference on Management Science & Engineering 21th …, 2014
72014
Developing a conceptual framework of smart work packaging for constraints management in prefabrication housing production
X Li, GQ Shen, P Wu, F Xue, HL Chi, CZ Li
Advanced Engineering Informatics, 2019
62019
Smart work packaging-enabled constraint-free path re-planning for tower crane in prefabricated products assembly process
X Li, H Chi, P Wu, GQ Shen
Advanced Engineering Informatics 43, 101008, 2020
42020
SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production
X Li, C Wu, P Wu, L Xiang, GQ Shen, S Vick, CZ Li
Journal of Cleaner Production 239, 117991, 2019
42019
On-site construction management framework based on a real-time building information modeling system
N Zeng, Y Liu, X Li, B Xu
eWork and eBusiness in Architecture, Engineering and Construction: ECPPM …, 2014
42014
Monitoring and Alerting of Crane Operator Fatigue Using Hybrid Deep Neural Networks in the Prefabricated Products Assembly Process
X Li, H Chi, W Zhang, GQ Shen
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
32019
Adopting lean thinking in virtual reality-based personalized operation training using value stream mapping
P Wang, P Wu, HL Chi, X Li
Automation in Construction 119, 103355, 2020
22020
The system can't perform the operation now. Try again later.
Articles 1–20