Follow
Andrew Knight
Title
Cited by
Cited by
Year
Advanced research methods in the built environment
A Knight, L Ruddock
John Wiley & Sons, 2009
4112009
The professionals’ perspective on the causes of project delay in the construction industry
G Agyekum-Mensah, AD Knight
Engineering, construction and architectural management 24 (5), 828-841, 2017
1452017
4Es and 4 Poles model of sustainability: Redefining sustainability in the built environment
G Agyekum‐Mensah, A Knight, C Coffey
Structural Survey 30 (5), 426-442, 2012
702012
The concept and development of supply chain management in the UK construction industry
R Morledge, A Knight, M Grada
Construction supply chain management: Concepts and case studies, 23-41, 2009
582009
Epistemology
AD Knight, N Turnbull
Wiley Blackwell, 2008
572008
Causes of construction delays in Iran: project management, logistics, technology and environment
E Asnaashari, A Knight, A Hurst, SS Farahani
Procs 25th Annual ARCOM Conference, 7-9, 2009
482009
Best practice tendering for design and build projects
A Griffith, A Knight, A King
Thomas Telford, 2003
332003
Economic incentives to improve occupational safety and health: a review from the European perspective
D Esler, L Eeckelaert, A Knight, D Treutlein, M Pecillo, J Elo-Schäfer, ...
European Agency for Safety and Health at Work, 2010
242010
Supply side short‐circuiting in design and build projects
AD Knight, A Griffith, AP King
Management decision 40 (7), 655-662, 2002
192002
Professionalism and ethical decision making
A Knight, R Morledge
conference proceedings of the QUT Research Week, Brisbane, Australia, 4-5, 2005
92005
Delays in the Iranian construction projects: Stakeholders and economy
E Asnaashari, A Knight, A Hurst
Challenges, opportunities and solutions in structural engineering and …, 2009
82009
Adaption of structured analysis design techniques methodology for construction project planning
G Agyekum-Mensah, A Knight, C Pasquire
ARCOM, Association of Researchers in Construction Management 2, 1055-1065, 2012
72012
Construction professional services: a process model
M Hoxley, A Knight, A Grada
RICS/Georgia Institute of Technology, 2007
72007
Understanding supply chain management from a main contractor's perspective
E Manu, A Knight
Successful construction supply chain management: Concepts and case studies …, 2020
62020
Causes of delay in Iran construction projects
E Asnaashari, S Farahani, A Hoseini, A Knight, A Hurst
Proceedings of the 5th International Conference on Construction in the 21st …, 2009
62009
Examining the dynamics of novation from the principal contractor's and architect's perspectives
A Griffith, A King, A Knight
Construction Economics and Building 3 (1), 13-18, 2003
62003
Causes of construction delays in Iran
E Asnaashari, A Knight, A Hurst, SS Farahani
Design and the Built Environment Nottingham Trent University, Burton Street …, 2010
52010
Use of a pilot study to assess the development of Virtual First Run Studies (VFRS)
V Hackett, C Pasquire, R Stratton, A Knight
IGLC 22, 1331-1342, 2014
32014
The use of first run studies to develop standard work in liquefied natural gas plant refurbishment
V Hackett, C Pasquire, R Stratton, A Knight
IGLC 23, 671, 2015
22015
Redefining sustainability in the built environment through project management
G Agyekum-Mensah, A Knight, C Coffey
12011
The system can't perform the operation now. Try again later.