Advanced research methods in the built environment A Knight, L Ruddock John Wiley & Sons, 2009 | 411 | 2009 |
The professionals’ perspective on the causes of project delay in the construction industry G Agyekum-Mensah, AD Knight Engineering, construction and architectural management 24 (5), 828-841, 2017 | 145 | 2017 |
4Es and 4 Poles model of sustainability: Redefining sustainability in the built environment G Agyekum‐Mensah, A Knight, C Coffey Structural Survey 30 (5), 426-442, 2012 | 70 | 2012 |
The concept and development of supply chain management in the UK construction industry R Morledge, A Knight, M Grada Construction supply chain management: Concepts and case studies, 23-41, 2009 | 58 | 2009 |
Epistemology AD Knight, N Turnbull Wiley Blackwell, 2008 | 57 | 2008 |
Causes of construction delays in Iran: project management, logistics, technology and environment E Asnaashari, A Knight, A Hurst, SS Farahani Procs 25th Annual ARCOM Conference, 7-9, 2009 | 48 | 2009 |
Best practice tendering for design and build projects A Griffith, A Knight, A King Thomas Telford, 2003 | 33 | 2003 |
Economic incentives to improve occupational safety and health: a review from the European perspective D Esler, L Eeckelaert, A Knight, D Treutlein, M Pecillo, J Elo-Schäfer, ... European Agency for Safety and Health at Work, 2010 | 24 | 2010 |
Supply side short‐circuiting in design and build projects AD Knight, A Griffith, AP King Management decision 40 (7), 655-662, 2002 | 19 | 2002 |
Professionalism and ethical decision making A Knight, R Morledge conference proceedings of the QUT Research Week, Brisbane, Australia, 4-5, 2005 | 9 | 2005 |
Delays in the Iranian construction projects: Stakeholders and economy E Asnaashari, A Knight, A Hurst Challenges, opportunities and solutions in structural engineering and …, 2009 | 8 | 2009 |
Adaption of structured analysis design techniques methodology for construction project planning G Agyekum-Mensah, A Knight, C Pasquire ARCOM, Association of Researchers in Construction Management 2, 1055-1065, 2012 | 7 | 2012 |
Construction professional services: a process model M Hoxley, A Knight, A Grada RICS/Georgia Institute of Technology, 2007 | 7 | 2007 |
Understanding supply chain management from a main contractor's perspective E Manu, A Knight Successful construction supply chain management: Concepts and case studies …, 2020 | 6 | 2020 |
Causes of delay in Iran construction projects E Asnaashari, S Farahani, A Hoseini, A Knight, A Hurst Proceedings of the 5th International Conference on Construction in the 21st …, 2009 | 6 | 2009 |
Examining the dynamics of novation from the principal contractor's and architect's perspectives A Griffith, A King, A Knight Construction Economics and Building 3 (1), 13-18, 2003 | 6 | 2003 |
Causes of construction delays in Iran E Asnaashari, A Knight, A Hurst, SS Farahani Design and the Built Environment Nottingham Trent University, Burton Street …, 2010 | 5 | 2010 |
Use of a pilot study to assess the development of Virtual First Run Studies (VFRS) V Hackett, C Pasquire, R Stratton, A Knight IGLC 22, 1331-1342, 2014 | 3 | 2014 |
The use of first run studies to develop standard work in liquefied natural gas plant refurbishment V Hackett, C Pasquire, R Stratton, A Knight IGLC 23, 671, 2015 | 2 | 2015 |
Redefining sustainability in the built environment through project management G Agyekum-Mensah, A Knight, C Coffey | 1 | 2011 |