关注
Lynn Shehab
Lynn Shehab
PhD Candidate
在 ualberta.ca 的电子邮件经过验证
标题
引用次数
引用次数
年份
Forecasting construction project performance with momentum using singularity functions in LPS
A Ezzeddine, L Shehab, G Lucko, F Hamzeh
Journal of Construction Engineering and Management 148 (8), 04022063, 2022
132022
Early warning dashboard for advanced construction planning metrics
F Hamzeh, A Ezzeddine, L Shehab, S Khalife, G El-Samad, S Emdanat
Construction Research Congress 2020, 67-75, 2020
112020
Singularity functions to enhance monitoring in the last planner system
A Ezzeddine, L Shehab, F Hamzeh, G Lucko
27th Annual Conference of the International Group for Lean Construction, 287-298, 2019
102019
Agent-based modelling and simulation of construction crew performance
L Shehab, A Ezzeddine, F Hamzeh, W Power, I Tommelein, E Daniel
Proc. 28th Annual Conference of the International Group for Lean …, 2020
92020
CCC_implementing the construction control room on a fast-paced project: the case study of the Beirut port explosion
A Ezzeddine, L Shehab, I Srour, W Power, E Zankoul, E Freiha
International Journal of Construction Management 23 (5), 745-755, 2023
82023
Singularity functions for early warning guidance in the last planner system®
LG Shehab, AM Ezzeddine, FR Hamzeh, G Lucko
Lean Construction Journal 2019, 76-90, 2019
72019
Improvisation in construction planning: An agent-based simulation approach
H Alhussein, L Shehab, F Hamzeh
Buildings 12 (10), 1608, 2022
62022
Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective
M Ghanem, F Hamzeh, O Seppänen, L Shehab, E Zankoul
Frontiers in Built Environment 8, 980023, 2022
62022
Machine Learning Framework to Predict Last Planner System Performance Metrics
L Shehab, D Salhab, E Pourrahimian, K Noueihed, G Lucko, FR Hamzeh
Construction Research Congress, 292-301, 2022
42022
Application of Chaos Theory in Project Management
E Pourrahimian, D Salhab, L Shehab, F Hamzeh, S AbouRizk
Construction Research Congress, 601-610, 2024
22024
Last Planner System Framework to Assess Planning Reliability in Architectural Design
L Shehab, M Al Hattab, S Khalife, G El Samad, Y Abbas, F Hamzeh
Buildings 13 (11), 2684, 2023
22023
Zooming Into Workers’ Psychology And Physiology Through A Lean Construction Lens
L Shehab, F Hamzeh
Proceedings of the 31st Annual Conference of the International Group for …, 2023
22023
LPS Framework to Assess Planning Reliability in Architectural Design
L Shehab, M Al Hattab, S Khalife, G El Samad, Y Abbas, F Hamzeh
Preprints, 2023
12023
Investigating and simulating collaboration among the LPS phases
E Pourrahimian, L Shehab, F Hamzeh
Proceedings of the 31st Annual Conference of the International Group for …, 2023
12023
LPS metric visualization, monitoring, and analysis system for project control
L Shehab, A Ezzeddine, G Lucko, F Hamzeh
Lean Construction 4.0: Driving a Digital Revolution of Production Management …, 2022
12022
Agent-Based Modeling and Simulation of Multidimensional Impacts of Construction Labor Productivity Factors
L Shehab, D Salhab, E Pourrahimian, M ElMenshawy, F Hamzeh
2022 Winter Simulation Conference (WSC), 1-12, 2022
12022
LPS Performance Diagnosis Model Using Fuzzy Inference System
L Shehab, E Pourrahimian, D Salhab, F Hamzeh
Proc. 30th Annual Conference of the International Group for Lean …, 2022
12022
Agent-Based Modelling as a Decision-Support System for Project Delivery Methods
D Salhab, L Shehab, K Noueihed, A Hammad
Canadian Society of Civil Engineering Annual Conference, 485-498, 2021
12021
Construction Control Room for Project Monitoring and Control
A Ezzeddine, L Shehab, I Srour, W Power
Proceedings of the Creative Construction e-Conference, 2020-01, 2020
12020
Employing simulation to assess value alignment and fulfillment within construction project settings and team dynamics
S Khalife, L Shehab, F Hamzeh
Automation in Construction 163, 105450, 2024
2024
系统目前无法执行此操作,请稍后再试。
文章 1–20