Follow
Matteo Zaupa
Matteo Zaupa
CNR – Institute for Plasma Science and Technology
Verified email at igi.cnr.it
Title
Cited by
Cited by
Year
The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors
V Toigo, R Piovan, S Dal Bello, E Gaio, A Luchetta, R Pasqualotto, ...
New Journal of Physics 19 (8), 085004, 2017
1862017
Progress in the realization of the PRIMA neutral beam test facility
V Toigo, D Boilson, T Bonicelli, R Piovan, M Hanada, A Chakraborty, ...
Nuclear Fusion 55 (8), 083025, 2015
1282015
Progress in the ITER neutral beam test facility
V Toigo, S Dal Bello, M Bigi, M Boldrin, G Chitarin, L Grando, A Luchetta, ...
Nuclear Fusion 59 (8), 086058, 2019
602019
First operation in SPIDER and the path to complete MITICA
G Serianni, V Toigo, M Bigi, M Boldrin, G Chitarin, S Dal Bello, L Grando, ...
Review of Scientific Instruments 91 (2), 2020
582020
SPIDER in the roadmap of the ITER neutral beams
G Serianni, V Toigo, M Bigi, M Boldrin, G Chitarin, S Dal Bello, L Grando, ...
Fusion Engineering and Design 146, 2539-2546, 2019
582019
On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress
V Toigo, D Marcuzzi, G Serianni, M Boldrin, G Chitarin, S Dal Bello, ...
Fusion Engineering and Design 168, 112622, 2021
562021
First operations with caesium of the negative ion source SPIDER
E Sartori, M Agostini, M Barbisan, M Bigi, M Boldrin, M Brombin, ...
Nuclear Fusion 62 (8), 086022, 2022
552022
The ITER neutral beam test facility towards SPIDER operation
V Toigo, S Dal Bello, E Gaio, A Luchetta, R Pasqualotto, P Zaccaria, ...
Nuclear Fusion 57 (8), 086027, 2017
512017
Neutralisation and transport of negative ion beams: physics and diagnostics
G Serianni, P Agostinetti, M Agostini, V Antoni, D Aprile, C Baltador, ...
New Journal of Physics 19 (4), 045003, 2017
462017
A suite of diagnostics to validate and optimize the prototype ITER neutral beam injector
R Pasqualotto, M Agostini, M Barbisan, M Brombin, R Cavazzana, G Croci, ...
Journal of Instrumentation 12 (10), C10009, 2017
322017
Maturation of critical technologies for the DEMO balance of plant systems
L Barucca, W Hering, SP Martin, E Bubelis, A Del Nevo, M Di Prinzio, ...
Fusion Engineering and Design 179, 113096, 2022
302022
Final design of the beam source for the MITICA injector
D Marcuzzi, P Agostinetti, M Dalla Palma, M De Muri, G Chitarin, ...
Review of Scientific Instruments 87 (2), 2016
292016
A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility
V Toigo, R Piovan, S Dal Bello, E Gaio, A Luchetta, R Pasqualotto, ...
Fusion Engineering and Design 123, 32-39, 2017
242017
Design and R&D for manufacturing the beamline components of MITICA and ITER HNBs
M Dalla Palma, E Sartori, P Blatchford, B Chuilon, J Graceffa, S Hanke, ...
Fusion Engineering and Design 96, 557-562, 2015
212015
Start of SPIDER operation towards ITER neutral beams
G Chitarin, G Serianni, V Toigo, M Bigi, M Boldrin, SD Bello, L Grando, ...
AIP Conference Proceedings 2052 (1), 2018
192018
Design and development of an Allison type emittance scanner for the SPIDER ion source
C Poggi, E Sartori, M Tollin, M Brombin, M Zaupa, E Fagotti, G Serianni
Review of Scientific Instruments 91 (1), 2020
132020
Progress on development of SPIDER diagnostics
R Pasqualotto, M Agostini, M Barbisan, M Bernardi, M Brombin, ...
AIP Conference Proceedings 1869 (1), 2017
132017
Lessons learned after three years of SPIDER operation and the first MITICA integrated tests
D Marcuzzi, V Toigo, M Boldrin, G Chitarin, S Dal Bello, L Grando, ...
Fusion Engineering and Design 191, 113590, 2023
112023
Spider, the negative ion source prototype for iter: Overview of operations and cesium injection
G Serianni, E Sartori, R Agnello, M Agostini, M Barbisan, M Bigi, M Boldrin, ...
IEEE Transactions on Plasma Science 51 (3), 927-935, 2023
112023
Investigation of corrosion-erosion phenomena in the primary cooling system of SPIDER
C Cavallini, M Dalla Palma, F Fellin, C Gasparrini, P Tinti, A Zamengo, ...
Fusion Engineering and Design 166, 112271, 2021
112021
The system can't perform the operation now. Try again later.
Articles 1–20