Heng Li
Heng Li
Chair Professor of Construction Informatics, The Hong Kong Polytechnic University
在 polyu.edu.hk 的電子郵件地址已通過驗證
標題引用次數年份
Quantifying the causes and costs of rework in construction
PED Love, H Li
Construction Management & Economics 18 (4), 479-490, 2000
4422000
Intelligent building research: a review
JKW Wong, H Li, SW Wang
Automation in construction 14 (1), 143-159, 2005
3682005
Using systems dynamics to better understand change and rework in construction project management systems
PED Love, GD Holt, LY Shen, H Li, Z Irani
International journal of project management 20 (6), 425-436, 2002
2932002
Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems
JKW Wong, H Li
Building and Environment 43 (1), 108-125, 2008
2792008
Contractor selection using the analytic network process
EWL Cheng, H Li
Construction management and Economics 22 (10), 1021-1032, 2004
2732004
Construction partnering process and associated critical success factors: quantitative investigation
EWL Cheng, H Li
Journal of management in engineering 18 (4), 194-202, 2002
2582002
Establishment of critical success factors for construction partnering
EWL Cheng, H Li, PED Love
Journal of management in engineering 16 (2), 84-92, 2000
2552000
Particle swarm optimization-based schemes for resource-constrained project scheduling
H Zhang, X Li, H Li, F Huang
Automation in Construction 14 (3), 393-404, 2005
2342005
Analytic hierarchy process: an approach to determine measures for business performance
EWL Cheng, H Li
Measuring business excellence 5 (3), 30-37, 2001
2332001
Determining the causal structure of rework influences in construction
PED Love, P Mandal, H Li
Construction Management & Economics 17 (4), 505-517, 1999
2271999
Total quality management and the learning organization: a dialogue for change in construction
PED Love, H Li, Z Irani, O Faniran
Construction Management & Economics 18 (3), 321-331, 2000
2262000
Using improved genetic algorithms to facilitate time-cost optimization
H Li, P Love
Journal of Construction Engineering and management 123 (3), 233-237, 1997
2201997
Concurrent engineering: a strategy for procuring construction projects
PED Love, A Gunasekaran, H Li
International Journal of Project Management 16 (6), 375-383, 1998
2171998
Analytic network process applied to project selection
EWL Cheng, H Li
Journal of construction engineering and management 131 (4), 459-466, 2005
2152005
Alternative concession model for build operate transfer contract projects
LY Shen, H Li, QM Li
Journal of construction engineering and management 128 (4), 326-330, 2002
1932002
Particle swarm optimization for resource-constrained project scheduling
H Zhang, H Li, CM Tam
International Journal of Project Management 24 (1), 83-92, 2006
1922006
An application of bar-code system for reducing construction wastes
Z Chen, H Li, CTC Wong
Automation in Construction 11 (5), 521-533, 2002
1912002
Partnering research in construction
H Li, EWL Cheng, PED Love
Engineering, Construction and Architectural Management 7 (1), 76-92, 2000
1902000
The analytic network process (ANP) approach to location selection: a shopping mall illustration
EWL Cheng, H Li, L Yu
Construction Innovation 5 (2), 83-97, 2005
1862005
Factor analysis-based studies on construction workplace safety management in China
DP Fang, F Xie, XY Huang, H Li
International Journal of Project Management 22 (1), 43-49, 2004
1842004
系統目前無法執行作業,請稍後再試。
文章 1–20