Xiaochun Luo
Xiaochun Luo
Principal Research Fellow of Dept. of Building and Real Estate, Hong Kong Polytechnic Univ.
Verified email at polyu.edu.hk - Homepage
Title
Cited by
Cited by
Year
Automatic Pixel‐Level Crack Detection and Measurement Using Fully Convolutional Network
X Yang, H Li, Y Yu, X Luo, T Huang, X Yang
Computer‐Aided Civil and Infrastructure Engineering, 2018
1762018
Detecting non-hardhat-use by a deep learning method from far-field surveillance videos
Q Fang, H Li, X Luo, L Ding, H Luo, TM Rose, W An
Automation in Construction 85, 1-9, 2018
1702018
Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology
JKW Wong, H Li, H Wang, T Huang, E Luo, V Li
Automation in Construction 33, 72-78, 2013
852013
A deep learning-based method for detecting non-certified work on construction sites
Q Fang, H Li, X Luo, L Ding, TM Rose, W An, Y Yu
Advanced Engineering Informatics 35, 56-68, 2018
752018
Recognizing Diverse Construction Activities in Site Images via Relevance Networks of Construction-Related Objects Detected by Convolutional Neural Networks
X Luo, H Li, D Cao, F Dai, JO Seo, SH Lee
Journal of Computing in Civil Engineering 32 (3), 04018012, 2018
702018
Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis
H Wang, Y Pan, X Luo
Automation in Construction 103, 41-52, 2019
632019
Towards efficient and objective work sampling: Recognizing workers' activities in site surveillance videos with two-stream convolutional networks
X Luo, H Li, D Cao, Y Yu, X Yang, T Huang
Automation in Construction 94 (2018), 360-370, 2018
552018
Computer vision aided inspection on falling prevention measures for steeplejacks in an aerial environment
Q Fang, H Li, X Luo, L Ding, H Luo, C Li
Automation in Construction 93, 148-164, 2018
522018
Chirp-spread-spectrum-based real time location system for construction safety management: A case study
H Li, G Chan, T Huang, M Skitmore, TYE Tao, E Luo, J Chung, XS Chan, ...
Automation in construction 55, 58-65, 2015
522015
A group decision support system for implementing value management methodology in construction briefing
X Luo, GQ Shen, S Fan, X Xue
International Journal of Project Management 29 (8), 1003-1017, 2011
452011
Capturing and Understanding Workers’ Activities in Far‐Field Surveillance Videos with Deep Action Recognition and Bayesian Nonparametric Learning
X Luo, H Li, X Yang, Y Yu, D Cao
Computer-Aided Civil and Infrastructure Engineering 34 (4), 333-351, 2019
392019
Relationship network structure and organizational competitiveness: Evidence from BIM implementation practices in the construction industry
D Cao, H Li, G Wang, X Luo, D Tan
Journal of management in engineering 34 (3), 04018005, 2018
342018
Dynamics of project-based collaborative networks for BIM implementation: analysis based on stochastic actor-oriented models
D Cao, H Li, G Wang, X Luo, X Yang, D Tan
Journal of Management in Engineering 33 (3), 04016055, 2017
312017
A field experiment of workers’ responses to proximity warnings of static safety hazards on construction sites
X Luo, H Li, T Huang, T Rose
Safety science 84, 216-224, 2016
292016
Investigation of the causality patterns of non-helmet use behavior of construction workers
H Li, X Li, X Luo, J Siebert
Automation in Construction 80, 95-103, 2017
282017
A case-based reasoning system for using functional performance specification in the briefing of building projects
X Luo, GQ Shen, S Fan
Automation in construction 19 (6), 725-733, 2010
262010
Vision-based detection and visualization of dynamic workspaces
X Luo, H Li, H Wang, Z Wu, F Dai, D Cao
Automation in Construction 104, 1-13, 2019
252019
An automatic and non-invasive physical fatigue assessment method for construction workers
Y Yu, H Li, X Yang, L Kong, X Luo, AYL Wong
Automation in construction 103, 1-12, 2019
252019
Developing a green building evaluation standard for interior decoration: A case study of China
Z Wu, H Li, Y Feng, X Luo, Q Chen
Building and Environment 152, 50-58, 2019
252019
Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates
L Kong, H Li, H Luo, L Ding, X Luo, M Skitmore
Automation in Construction 81, 34-43, 2017
242017
The system can't perform the operation now. Try again later.
Articles 1–20