关注
Javad Seif
标题
引用次数
引用次数
年份
Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA
AJ Yu, J Seif
Computers & Industrial Engineering 97, 26-40, 2016
742016
An integrated support vector regression–imperialist competitive algorithm for reliability estimation of a shearing machine
A Azadeh, J Seif, M Sheikhalishahi, M Yazdani
International Journal of Computer Integrated Manufacturing 29 (1), 16-24, 2016
532016
Component based life cycle costing in replacement decisions
J Seif, M Rabbani
Journal of Quality in Maintenance Engineering 20 (4), 436-452, 2014
442014
A multi-objective multi-stage stochastic model for project team formation under uncertainty in time requirements
F Rahmanniyay, AJ Yu, J Seif
Computers & Industrial Engineering 132, 153-165, 2019
282019
Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements
J Seif, AJ Yu, F Rahmanniyay
International Journal of Production Research 56 (9), 3204-3225, 2018
282018
Integrated preventive maintenance and flow shop scheduling under uncertainty
J Seif, M Dehghanimohammadabadi, AJ Yu
Flexible services and manufacturing journal 32, 852-887, 2020
232020
An integrated simulation-analysis of variance methodology for effective analysis of CBM alternatives
A Azadeh, SM Asadzadeh, J Seif
International Journal of Computer Integrated Manufacturing 27 (7), 624-637, 2014
172014
An extensive operations and maintenance planning problem with an efficient solution method
J Seif, JY Andrew
Computers & Operations Research 95, 151-162, 2018
162018
Parallel machine replacement under horizon uncertainty
J Seif, BA Shields, AJ Yu
The Engineering Economist 64 (1), 1-23, 2019
62019
A Multidisciplinary Team Formation Problem for Projects in the Aerospace Industry
G Asatourian, K Maramot, DM Reyes, J Seif
IIE Annual Conference. Proceedings, 914-919, 2021
32021
Multi-Objective Patient Appointment Scheduling Framework (MO-PASS): a data-table input simulation–optimization approach
M Dehghanimohammadabadi, M Rezaeiahari, J Seif
Simulation 99 (4), 363-383, 2023
22023
Parallel machine replacement with shipping decisions
BA Shields, J Seif, AJ Yu
International Journal of Production Economics 218, 62-71, 2019
22019
Optimization of Resource Allocation for California Wildfires
A Preciado, S Jaworski, L Ta, J Seif
IIE Annual Conference. Proceedings, 950-955, 2021
12021
Minimizing cost of parallel machine replacement in construction projects with horizon uncertainty
J Seif, JY Andrew, BA Shields
IIE Annual Conference. Proceedings, 800-805, 2017
12017
Optimal Allocation of Campus Parking Spaces to Personal Vehicles: A Case Study
C To, S Khakali, J Seif
IIE Annual Conference. Proceedings, 1-6, 2022
2022
Mission Scheduling Maximization Subject to Aircraft System Reliability and Mission Requirements
J Thompson, E Hilario, J Seif
IIE Annual Conference. Proceedings, 1052-1057, 2021
2021
The Online Resources Shared on Twitter About the# MeToo Movement: The Pareto Principle
I Tahamtan, J Seif
arXiv preprint arXiv:1906.12321, 2019
2019
The Integration of Maintenance Decisions and Flow Shop Scheduling
J Seif
2018
Multi-stage formulation of a multi-depot consultant assignment and routing problem with skill and priority matching
AJ Yu, B Shields, J Seif
Proceedings of International Conference on Computers and Industrial …, 2017
2017
Flexible and Diverse Maintenance Activities in a Single Machine Scheduling Problem
J Seif, R Tavakkoli-Moghaddam, M Baghersad
Proceedings of the IIE Asian Conference, Singapore, 2012
2012
系统目前无法执行此操作,请稍后再试。
文章 1–20