Follow
陈晨
Title
Cited by
Cited by
Year
Sustainability and interactivity between cities and ports: A two-stage data envelopment analysis (DEA) approach
C Chen, JSL Lam
Maritime Policy & Management 45 (7), 944-961, 2018
822018
A new model for identifying critical success factors influencing BIM adoption from precast concrete manufacturers’ view
TCH Phang, C Chen, RLK Tiong
Journal of Construction Engineering and Management 146 (4), 2020
552020
Optimal facility layout planning for AGV-based modular prefabricated manufacturing system
C Chen, DT Huy, LK Tiong, IM Chen, Y Cai
Automation in Construction 98, 310-321, 2019
512019
Using queuing theory and simulated annealing to design the facility layout in an AGV-based modular manufacturing system
C Chen, LK Tiong
International Journal of Production Research 57 (17), 5538-5555, 2019
462019
A Conceptual Framework for Estimating Building Embodied Carbon Based on Digital Twin Technology and Life Cycle Assessment
RT Chen Chen, Zengfeng Zhao, Jianzhuang Xiao
Sustainability 13, 13875, 2021
452021
A novel learning cloud Bayesian network for risk measurement
C Chen, L Zhang, RLK Tiong
Applied Soft Computing 87, 105947, 2020
442020
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
C Chen, LK Tiong, IM Chen
International Journal of Production Research 57 (10), 3003-3019, 2019
312019
A new lossy compression algorithm for wireless sensor networks using Bayesian predictive coding
C Chen, L Zhang, RLK Tiong
Wireless Networks 26 (8), 5981-5995, 2020
282020
Using genetic algorithm to automate the generation of open-plan office layout
RT C. CHEN, Ricardo Chacon
International Journal of Architectural Computing, 2020
13*2020
Flow shop scheduling of hybrid make-to-stock and make-to-order in a distributed precast concrete production system
RT Chen Chen, Jinchi Han, Ziwen Liu
Cleaner Logistics and Supply Chain 7, 100106, 2023
42023
Life cycle assessment of off-site construction using ultra-high-performance concrete
C Ji, Y Wu, Z Zhao, C Chen, L Yao
Sustainability 14 (11), 6907, 2022
42022
Explicit analytic solutions of Kdv equation given by the homotopy analysis method
C CHEN, C WANG, S LIAO
Advances In Engineering Mechanics—Reflections And Outlooks: In Honor of …, 2005
22005
Identifying the promising production planning and scheduling method for manufacturing in Industry 4.0: a literature review
WK Chen Chen, Tiong Lee Kong
Production & Manufacturing Research 11 (1), 2279329, 2023
12023
Ensuring sufficient cabin hospital beds for curbing the spread of COVID-19–Findings from petri net analysis
C Chen, Z Xing, Y Xi, R Tiong
Heliyon 8 (10), 2022
12022
Genetic Algorithm to Dry Dock Block Placement Arrangement Considering Subsequent Ships
C Chen, KH Chua, LG Yang
EPPM, 2012
12012
Optimized shipyard steel plate cutting plan based on genetic algorithm
C Chen, CK Huat
The 2nd International Conference on Engineering, Project, and Production …, 2011
12011
Planning semi-automated precast production using GA
RT C. CHEN, Thomas Phang
International Journal of Industrialized Construction, 2020
2020
The optimal sizes of workstation area and storage area in a precast plant for manufacturing of modular prefabricated products
C Chen, TH Duc, TL Kong, C I-Ming, C Yiyu
2018
Polygon nesting using genetic algorithm
KHW Chen Chen, Kim Huat Chua
the 5th ABB Cup National Automation Thesis Contest, 2011
2011
DP capability assessment tool for semi-submersible
CC Wen Ping Wang, Tan Hong Seow, Keng Hwee Wee
Dynamic Positioning Asia Conference & Exhibition, 2011
2011
The system can't perform the operation now. Try again later.
Articles 1–20