The energy scheduling problem: Industrial case-study and constraint propagation techniques C Artigues, P Lopez, A Hait International Journal of Production Economics 143 (1), 13-23, 2013 | 96 | 2013 |
Integrated production and utility system approach for optimizing industrial unit operations MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann Energy 35 (2), 611-627, 2010 | 82 | 2010 |
Integrated production and utility system approach for optimizing industrial unit operations MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann Energy 35 (2), 611-627, 2010 | 82 | 2010 |
Project scheduling under uncertainty using fuzzy modelling and solving techniques M Masmoudi, A HaïT Engineering Applications of Artificial Intelligence 26 (1), 135-149, 2013 | 75 | 2013 |
On electrical load tracking scheduling for a steel plant A Hait, C Artigues Computers & Chemical Engineering 35 (12), 3044-3047, 2011 | 57 | 2011 |
Gestion de production et ressources humaines: méthodes de planification dans les systèmes productifs P Baptiste Presses inter Polytechnique, 2005 | 51 | 2005 |
Motion planning on rough terrain for an articulated vehicle in presence of uncertainties A Hait, T Simeon Proceedings of IEEE/RSJ International Conference on Intelligent Robots and …, 1996 | 50 | 1996 |
Robust motion planning for rough terrain navigation A Hait, T Siméon, M Taïx IN IEEE INT. CONF. ON INTELLIGENT ROBOTS AND SYSTEMS KYONGJU, KOREA, 1999 | 39 | 1999 |
A hybrid CP/MILP method for scheduling with energy costs A Hait, C Artigues European Journal of Industrial Engineering 5 (4), 471-489, 2011 | 35 | 2011 |
Scheduling under energy constraints C Artigues, P Lopez, A Haït | 24 | 2009 |
Algorithms for rough terrain trajectory planning A Haït, T Simeon, M Taïx Advanced Robotics 16 (8), 673-699, 2002 | 21 | 2002 |
A rough-cut capacity planning model with overlapping G Baydoun, A Haït, R Pellerin, B Clément, G Bouvignies OR spectrum 38 (2), 335-364, 2016 | 15 | 2016 |
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants R Thery, G Hétreux, MH Agha, A Haït, JM Le Lann International journal of production research 50 (3), 623-646, 2012 | 13 | 2012 |
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants R Thery, G Hétreux, MH Agha, A Haït, JM Le Lann International journal of production research 50 (3), 623-646, 2012 | 13 | 2012 |
Fuzzy uncertainty modelling for project planning: application to helicopter maintenance M Masmoudi, A Haït International journal of production research 50 (13), 3594-3611, 2012 | 11 | 2012 |
A new event-based MILP model for the resource-constrained project scheduling problem with variable intensity activities A Haït, G Baydoun The IEEE international conference on industrial engineering and engineering …, 2012 | 10 | 2012 |
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity M Masmoudi, A Haït Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011 | 10 | 2011 |
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity M Masmoudi, A Haït Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011 | 10 | 2011 |
Fuzzy tactical project planning: Application to helicopter maintenance M Masmoudi, EW Hans, A Haït ETFA2011, 1-8, 2011 | 9 | 2011 |
A tactical model under uncertainty for helicopter maintenance planning M Masmoudi, A Haït the 8th ENIM IFAC International Conference of Modeling and Simulation, MOSIM …, 2010 | 9 | 2010 |