Follow
Ilhem Slama
Title
Cited by
Cited by
Year
The esc-eorp euro-endo (european infective endocarditis) registry
G Habib, P Lancellotti, PA Erba, A Sadeghpour, M Meshaal, A Sambola, ...
European Heart Journal-Quality of Care and Clinical Outcomes 5 (3), 202-207, 2019
772019
New mixed integer approach to solve a multi-level capacitated disassembly lot-sizing problem with defective items and backlogging
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Journal of Manufacturing Systems 56, 50-57, 2020
352020
Genetic algorithm and Monte Carlo simulation for a stochastic capacitated disassembly lot-sizing problem under random lead times
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Computers & Industrial Engineering 159, 107468, 2021
282021
Disassembly scheduling problem: literature review and future research directions
I Slama, O Ben-Ammar, F Masmoudi, A Dolgui
IFAC-PapersOnLine 52 (13), 601-606, 2019
222019
Scenario-based stochastic linear programming model for multi-period disassembly lot-sizing problems under random lead time
I Slama, O Ben-Ammar, F Masmoudi, A Dolgui
IFAC-PapersOnLine 52 (13), 595-600, 2019
212019
Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
I Slama, O Ben-Ammar, S Thevenin, A Dolgui, F Masmoudi
European Journal of Operational Research 303 (3), 1183-1198, 2022
162022
Reverse logistics network problem using simulated annealing with and without priority-algorithm
M Benaissa, I Slama, MM Dhiaf
Archives of Transport 47 (3), 7-17, 2018
92018
A stochastic model for a two-level disassembly lot-sizing problem under random lead time
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Advances in Production Management Systems. The Path to Digital …, 2020
82020
Newsboy problem with two-level disassembly system and stochastic lead time
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Congrès Annuel de la Société Française de Recherche Opérationnelle et d'Aide …, 2020
62020
A newsboy formulae to optimize planned lead times for two-level disassembly systems
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
IFAC-PapersOnLine 53 (2), 10816-10821, 2020
62020
Human-centred assembly and disassembly systems: a survey on technologies, ergonomic, productivity and optimisation
R Slama, O Ben-Ammar, H Tlahig, I Slama, P Slangen
IFAC-PapersOnLine 55 (10), 1722-1727, 2022
52022
A model for a multi-level disassembly system under random disassembly lead times
I Slama, O Ben-Ammar, A Dolgui
Ifip international conference on advances in production management systems …, 2021
32021
Approches d’optimisation pour un problème de planification de désassemblage sous incertitude des délais de désassemblage
I Slama, O Ben-Ammar, A Dolgui, F Masmoudi
Génie industriel et productique 3 (1), 2020
32020
Two-stage Stochastic Program for Capacitated Disassembly Lot-sizing Under Random Yield
O Laouini, I Slama, F Hnaien, Z Jemai
2023 IEEE International Conference on Networking, Sensing and Control (ICNSC …, 2023
12023
Assembly line balancing with collaborative robots under uncertainty of human processing times
I Slama, T Arbaoui, A Nourmohammadi, M Fathi
2023 9th International Conference on Control, Decision and Information …, 2023
12023
Two-stage stochastic program for disassembly lot-sizing under random ordering lead time
I Slama, O Ben-Ammar, D Garcia, A Dolgui
IFAC-PapersOnLine 55 (10), 1363-1368, 2022
12022
Integrating Human-Centricity, Sustainability, and Resilience in Digital Twin Models for Industry 5.0: A Multi-Objective Optimization Approach
M Bezoui, I Slama, A Bounceur, SM Qaisar, M Hammoudeh, ...
Congrès Annuel de la Société Française de Recherche Opérationnelle et d’Aide …, 2024
2024
Multi-objective optimization of cycle time and robot energy expenditure in human-robot collaborated assembly lines
A Nourmohammadi, M Fathi, T Arbaoui, I Slama
Procedia Computer Science 232, 1279-1288, 2024
2024
An overview on human-centred technologies, measurements and optimisation in assembly systems
R Slama, I Slama, H Tlahig, P Slangen, O Ben-Ammar
International Journal of Production Research, 1-23, 2023
2023
Stochastic approaches for multi-echelon disassembly lot-sizing under random lead times
I Slama, O Ben-Ammar, S Thevenin, A Dolgui
CIE50 Proceedings, 2023
2023
The system can't perform the operation now. Try again later.
Articles 1–20