Follow
Jin Gang Lee
Title
Cited by
Cited by
Year
End-Users’ augmented reality utilization for architectural design review
JG Lee, JO Seo, A Abbas, M Choi
Applied Sciences 10 (15), 5363, 2020
472020
Facility management process of an office building
H Shin, HS Lee, M Park, JG Lee
Journal of Infrastructure Systems 24 (3), 04018017, 2018
342018
BIM-based spatial augmented reality (SAR) for architectural design collaboration: A proof of concept
Y Jin, JO Seo, JG Lee, S Ahn, SU Han
Applied Sciences 10 (17), 5915, 2020
262020
Wearable acceleration-based action recognition for long-term and continuous activity analysis in construction site
Y Gong, K Yang, JO Seo, JG Lee
Journal of Building Engineering 52, 104448, 2022
172022
Synthetic image dataset development for vision-based construction equipment detection
JG Lee, J Hwang, S Chi, JO Seo
Journal of Computing in Civil Engineering 36 (5), 04022020, 2022
152022
A framework integrating cost and schedule based on BIM using IFC
JG Lee, HS Lee, M Park, M Jung
Korean journal of construction engineering and management 14 (3), 53-64, 2013
122013
Early-stage cost estimation model for power generation project with limited historical data
JG Lee, HS Lee, M Park, JO Seo
Engineering, Construction and Architectural Management 29 (7), 2599-2614, 2022
92022
Research on Essential Features for BIM Model Collaboration System between Architect & Engineer
W Kim, M Park, HS Lee, J Lee, KP Lee
Journal of the architectural institute of Korea planning & design 31 (2 …, 2015
62015
Transfer Learning-Based Object Detection Model for Steel Structure Bolt Fastening Inspection
J Choi, M Ha, JG Lee
Applied Sciences 13 (17), 9499, 2023
22023
Decision-Making Framework for Sustainable Construction Products Selection in SMEs
D Sivasubramanian, JG Lee
Sustainability 14 (21), 14264, 2022
22022
Selecting quantifiable indicators for evaluating BIM-based design collaboration performance
J Lee, H Lee, M Park, S Kim
Journal of the Architectural Institute of Korea Planning & Design 32 (10), 35-43, 2016
22016
An Interoperable Coordination Method for Sharing Communication Information Using BCF (BIM Collaboration Format)
JG Lee, HS Lee, M Park, W Kim
Construction Research Congress 2016, 2443-2452, 2016
22016
Schedule Uncertainty Analysis System Framework to Manage and Allocate Historical Data for Industrial Construction Project
I Yoon, HS Lee, M Park, JG Lee, SS Jung
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
12019
Productivity Analysis Method of Construction Structural Work using Computer Vision
JG Lee, JO Seo, S Chi, J Hwang
Journal of Construction Automation and Robotics, 2022
2022
The system can't perform the operation now. Try again later.
Articles 1–14