Follow
Sadok TURKI
Title
Cited by
Cited by
Year
Modelling and optimization of a manufacturing/remanufacturing system with storage facility under carbon cap and trade policy
S Turki, C Sauvey, N Rezg
Journal of Cleaner Production 193, 441-458, 2018
1052018
Optimization and analysis of a manufacturing–remanufacturing–transport–warehousing system within a closed-loop supply chain
S Turki, S Didukh, C Sauvey, N Rezg
Sustainability 9 (4), 561, 2017
652017
Perturbation analysis for continuous and discrete flow models: a study of the delivery time impact on the optimal buffer level
S Turki, S Hennequin, N Sauer
International Journal of Production Research 51 (13), 4011-4044, 2013
382013
Optimal design of a manufacturing-remanufacturing-transport system within a reverse logistics chain
A Tighazoui, S Turki, C Sauvey, N Sauer
The International Journal of Advanced Manufacturing Technology 101, 1773-1791, 2019
332019
Modelling and analysis for sequentially optimising production, maintenance and delivery activities taking into account product returns
Z Hajej, S Turki, N Rezg
International Journal of Production Research 53 (15), 4694-4719, 2015
332015
Optimization of two-level disassembly/remanufacturing/assembly system with an integrated maintenance strategy
Z Guiras, S Turki, N Rezg, A Dolgui
Applied Sciences 8 (5), 666, 2018
322018
Impact of the quality of returned-used products on the optimal design of a manufacturing/remanufacturing system under carbon emissions constraints
S Turki, N Rezg
Sustainability 10 (9), 3197, 2018
262018
Unreliable manufacturing supply chain optimisation based on an infinitesimal perturbation analysis
S Turki, N Rezg
International Journal of Systems Science: Operations & Logistics 5 (1), 25-44, 2018
242018
Optimal maintenance plan for two-level assembly system and risk study of machine failure
Z Guiras, S Turki, N Rezg, A Dolgui
International Journal of Production Research 57 (8), 2446-2463, 2019
212019
Perturbation analysis-based optimisation for a failure-prone manufacturing system with constant delivery time and stochastic demand
S Turki, S Hennequin, N Sauer
International Journal of Advanced Operations Management 4 (1-2), 124-153, 2012
212012
Impact of delivery time on optimal production/delivery/maintenance planning
T Sadok, H Zied, R Nidhal
2012 IEEE International Conference on Automation Science and Engineering …, 2012
192012
Optimization of stochastic fluid model using perturbation analysis: a manufacturing-remanufacturing system with stochastic demand and stochastic returned products
S Turki, O Bistorin, N Rezg
HAL Post-Print, 2014
172014
FPA method for optimal production planning under availability/degradation machine and subcontracting constraint
S Ayed, Z Hajej, S Turki, N Rezg
International Journal of Production Research 55 (8), 2135-2148, 2017
152017
Infinitesimal perturbation analysis based optimization for a manufacturing-remanufacturing system
T Sadok, B Olivier, R Nidhal
2013 IEEE 18th Conference on Emerging Technologies & Factory Automation …, 2013
142013
Optimal manufacturing-reconditioning decisions in a reverse logistic system under periodic mandatory carbon regulation
S Turki, S Sahraoui, C Sauvey, N Sauer
Applied Sciences 10 (10), 3534, 2020
122020
Performances evaluation of a failure-prone manufacturing system with time to delivery and stochastic demand
S Turki, S Hennequin, N Sauer
13th IFAC Symposium On Information Control Problems in Manufacturing, 2009
122009
Mathematical model for production plan optimization—a case study of discrete event systems
S Rezig, W Ezzeddine, S Turki, N Rezg
Mathematics 8 (6), 955, 2020
102020
Study of the E-maintenance service in E-logistic supply chain
S Turki, N Rezg
2017 IEEE Symposium on Service-Oriented System Engineering (SOSE), 132-137, 2017
82017
Pricing and remanufacturing decisions in a dual channel reverse supply chain: study of three configurations with after sales services
HA Farouk, T Sadok, R Nidhal
IFAC-PapersOnLine 55 (10), 1758-1763, 2022
72022
Optimization of flight rescheduling problem under carbon tax
MA Kammoun, S Turki, N Rezg
Sustainability 12 (14), 5576, 2020
72020
The system can't perform the operation now. Try again later.
Articles 1–20