Follow
Naser Sharifloo
Naser Sharifloo
Associate Professor in nuclear engineering
Verified email at iranian.ac.ir - Homepage
Title
Cited by
Cited by
Year
Delays in the road construction projects from risk management perspective
R Mohajeri Borje Ghaleh, T Pourrostam, N Mansour Sharifloo, ...
Infrastructures 6 (9), 135, 2021
92021
Trade-off Between Cost and Safety To Cope with Station Blackout in A PWR in A Deregulated Electricity Market
G Ahmad Khanbeigi, G Jahanfarnia, NM Sharifloo, MK Sheikh-el-Eslami, ...
Journal of Electrical Engineering & Technology 15, 2045-2056, 2020
12020
Improving the Project Risk Management Process in Construction Projects by Provide a Suggested Method Based on PMBOK Standard and SHAMPU Model
R Mohajeri Borje Ghaleh, T Pourrostam, N Mansour Sharifloo, ...
Journal of Structural and Construction Engineering 9 (5), 5-19, 2022
2022
واکاوی دلایل تاخیر از دیدگاه مدیریت ریسک در مرحله اجرای پروژه‌های راه‌سازی (مطالعه موردی: محور گرمسار-سیمین دشت)
مهاجری برج قلعه, پوررستم, توحید, منصور شریفلو, ناصر, مجروحی سردرود, ...
پژوهش های زیرساخت های عمرانی 5 (2), 69-82, 2020
2020
Reviewing Causes of Delay From the Risk Management Perspective in Execution Stage in Road Construction Projects (Case Study: Garmsar-Simin Dasht Road)
R Mohajeri Borje Ghaleh, T Pourrostam, N Mansour Sharifloo, ...
Civil Infrastructure Researches 5 (2), 69-82, 2020
2020
Design and make of automatically controller intelligent system for nuclear reactor control rods
MS Seyed Alireza, S Cirus, A Cirus, S Naser, J Gholamreza
2009
The system can't perform the operation now. Try again later.
Articles 1–6