Follow
Sivakumar Appa Iyer
Sivakumar Appa Iyer
Verified email at ntu.edu.sg
Title
Cited by
Cited by
Year
Management research methodology: Integration of principles, methods and techniques
KN Krishnaswamy, AI Sivakumar, M Mathirajan
Pearson Education India, 2006
3782006
A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor
M Mathirajan, AI Sivakumar
The International Journal of Advanced Manufacturing Technology 29, 990-1001, 2006
3742006
A bee colony optimization algorithm to job shop scheduling
CS Chong, MYH Low, AI Sivakumar, KL Gay
Proceedings of the 2006 winter simulation conference, 1954-1961, 2006
3632006
Job shop scheduling techniques in semiconductor manufacturing
AK Gupta, AI Sivakumar
The International Journal of Advanced Manufacturing Technology 27, 1163-1169, 2006
1872006
A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing
AI Sivakumar, CS Chong
Computers in Industry 45 (1), 59-78, 2001
1052001
Simulation-based scheduling for dynamic discrete manufacturing
AI Sivakumar
Proceedings of the 2003 Winter Simulation Conference, 2003. 2, 1465-1473, 2003
922003
An inventory–routing problem with the objective of travel time minimization
K Li, B Chen, AI Sivakumar, Y Wu
European Journal of Operational Research 236 (3), 936-945, 2014
912014
Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain
KP Li, VK Ganesan, AI Sivakumar*
International journal of production research 43 (13), 2671-2685, 2005
902005
Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system
AI Sivakumar
Proceedings of the 31st conference on Winter simulation: Simulation---a …, 1999
751999
Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
K Li, VK Ganesan, AI Sivakumar
Computers & Industrial Engineering 51 (2), 264-278, 2006
672006
Optimization of due-date objectives in scheduling semiconductor batch manufacturing
AK Gupta, AI Sivakumar
International Journal of Machine Tools and Manufacture 46 (12-13), 1671-1679, 2006
672006
An efficient new job release control methodology
C Qi, AI Sivakumar, SB Gershwin
International Journal of Production Research 47 (3), 703-731, 2009
662009
Multiobjective dynamic scheduling using discrete event simulation
AI Sivakumar
International Journal of Computer Integrated Manufacturing 14 (2), 154-167, 2001
632001
Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families
M Mathirajan, AI Sivakumar
The International Journal of Advanced Manufacturing Technology 28, 1038-1047, 2006
602006
Simulation based multiobjective schedule optimization in semiconductor manufacturing
AK Gupta, AI Sivakumar
Proceedings of the Winter Simulation Conference 2, 1862-1870, 2002
592002
Heuristic algorithms for scheduling heat-treatment furnaces of steel casting industries
M Mathirajan, V Chandru, AI Sivakumar
Sadhana 32, 479-500, 2007
562007
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
K Li, AI Sivakumar, VK Ganesan
European Journal of Operational Research 187 (2), 442-455, 2008
512008
A network flow approach for tactical resource planning in outpatient clinics
TBT Nguyen, AI Sivakumar, SC Graves
Health care management science 18, 124-136, 2015
422015
Using a bee colony algorithm for neighborhood search in job shop scheduling problems
CS Chong, MYH Low, AI Sivakumar, KL Gay
21st European conference on modeling and simulation (ECMS 2007), 2007
422007
Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation
K Li, AI Sivakumar, VK Ganesan
International Journal of Production Economics 115 (2), 482-491, 2008
412008
The system can't perform the operation now. Try again later.
Articles 1–20