Queueing system with impatient customers: A review K Wang, N Li, Z Jiang Proceedings of 2010 IEEE International Conference on Service Operations and …, 2010 | 116 | 2010 |
Cooperation or Competition? Channel Choice for a Remanufacturing Fashion Supply Chain with Government Subsidy K Wang, Y Zhao, Y Cheng, TM Choi Sustainability 6 (10), 7292-7310, 2014 | 109 | 2014 |
A genetic-algorithm-based approach to the two-echelon capacitated vehicle routing problem with stochastic demands in logistics service K Wang, S Lan, Y Zhao Journal of the Operational Research Society, 1-13, 2017 | 67 | 2017 |
Customer demand prediction of service-oriented manufacturing incorporating customer satisfaction J Cao, Z Jiang, K Wang International Journal of Production Research 54 (5), 1303-1321, 2015 | 49 | 2015 |
Optimal production and admission control for a stochastic SOM system with demands for product and PSS K Wang, Z Jiang, N Li, N Geng International Journal of Production Research 51 (23-24), 7270-7288, 2013 | 24 | 2013 |
服务型制造与传统制造的差异及新问题研究 谢文明, 江志斌, 王康周, 林文进 中国科技论坛, 59-65, 2012 | 16 | 2012 |
Impact of customer impatience on a production service system K Wang, S Lan, Z Jiang International Journal of Production Research 54 (9), 2731-2749, 2016 | 15 | 2016 |
Optimal production control of a service-oriented manufacturing system with customer balking behavior K Wang, Z Jiang, N Li, N Geng Flexible Services and Manufacturing Journal 26 (3), 387-407, 2014 | 15 | 2014 |
服务型制造综合资源计划体系研究 王康周, 江志斌, 李娜, 耿娜 工业工程与管理 16 (3), 113-120, 2011 | 12 | 2011 |
Customer demand prediction of service-oriented manufacturing using the least square support vector machine optimized by particle swarm optimization algorithm J Cao, Z Jiang, K Wang Engineering Optimization, 1-14, 2016 | 9 | 2016 |
服务型制造混合供应链管理研究 王康周, 江志斌, 林文进, 谢文明 软科学 27 (5), 93-95, 2013 | 9 | 2013 |
Optimal Scheduling Policies for a Production Service System with Two Items K Wang, Z Jiang, W Xie IFAC Proceedings Volumes 46 (9), 712-717, 2013 | 5 | 2013 |
生产服务系统优先权能力协同分配策略 王康周, 江志斌, 李娜 系统工程理论与实践 34 (11), 2808-2816, 2014 | 4 | 2014 |
Integrated capacity allocation policies for a production service system with two-class customers and items K Wang, Z Jiang, G Li, J Cao 2013 IEEE International Conference on Automation Science and Engineering …, 2013 | 4 | 2013 |
不耐烦行为生产库存系统最优生产和分包控制 王康周, 江志斌, 李娜, 李国威 工业工程与管理 17 (4), 65-70, 2012 | 4 | 2012 |
Analytical characterisations of a seasonal compound Poisson demand process with growth trend R Yan, K Wang, G Li, N Li International Journal of Services Operations and Informatics 7 (2-3), 167-181, 2012 | 3 | 2012 |
Sensitivity Analysis of Lead Time in MRP System: A Case Study X Wang, K Wang, Z Qi Management and Service Science, 2009. MASS'09. International Conference on, 1-4, 2009 | 3 | 2009 |
A Framework for Resource Planning of Service-Oriented Manufacturing W Kang-zhou, J Zhi-bin, LI Na, G Na Industrial Engineering and Management 3, 021, 2011 | 2 | 2011 |
A stochastic model of multi-level/multi-stage logistics system under periodically oscillating demand K Wang, M Bogataj Faculty of Economics, KMOR, 2007 | 2 | 2007 |
不耐烦顾客生产服务系统建模与优化 王晓燕, 王康周, 祁忠斌, 江志斌, 李娜 山东大学学报 (工学版) 44 (2), 55-63, 2014 | 1 | 2014 |