Ant colony optimization algorithm to solve for the transportation problem of cross-docking network R Musa, JP Arnaout, H Jung Computers & Industrial Engineering 59 (1), 85-92, 2010 | 201 | 2010 |
A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times JP Arnaout, G Rabadi, R Musa Journal of Intelligent Manufacturing 21, 693-701, 2010 | 187 | 2010 |
Exploring the effects of cooperative adaptive cruise control on highway traffic flow using microscopic traffic simulation GM Arnaout, JP Arnaout Transportation Planning and Technology 37 (2), 186-199, 2014 | 113 | 2014 |
A two-stage Ant Colony optimization algorithm to minimize the makespan on unrelated parallel machines—part II: enhancements and experimentations JP Arnaout, R Musa, G Rabadi Journal of Intelligent Manufacturing 25, 43-53, 2014 | 96 | 2014 |
Optimization of quality and operational costs through improved scheduling of harvest operations JPM Arnaout, M Maatouk International Transactions in operational research 17 (5), 595-605, 2010 | 75 | 2010 |
Ant colony optimization algorithm for the Euclidean location-allocation problem with unknown number of facilities JP Arnaout Journal of Intelligent Manufacturing 24, 45-54, 2013 | 57 | 2013 |
Maximizing the utilization of operating rooms with stochastic times using simulation JPM Arnaout, S Kulbashian 2008 Winter Simulation Conference, 1617-1623, 2008 | 47 | 2008 |
ACO for the surgical cases assignment problem C Rizk, JP Arnaout Journal of Medical Systems 36, 1891-1899, 2012 | 42 | 2012 |
A worm optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times JP Arnaout Annals of Operations Research 285 (1), 273-293, 2020 | 41 | 2020 |
Ant colony optimization algorithm to parallel machine scheduling problem with setups JP Arnaout, R Musa, G Rabadi 2008 IEEE international conference on automation science and engineering …, 2008 | 36 | 2008 |
Heuristics for the maximization of operating rooms utilization using simulation JP Arnaout Simulation 86 (8-9), 573-583, 2010 | 34 | 2010 |
Rescheduling of parallel machines with stochastic processing and setup times JP Arnaout Journal of Manufacturing Systems 33 (3), 376-384, 2014 | 28 | 2014 |
Rescheduling of unrelated parallel machines under machine breakdowns JP Arnaout, G Rabadi International Journal of Applied Management Science 1 (1), 75-89, 2008 | 28 | 2008 |
A dynamic heuristic for the stochastic unrelated parallel machine scheduling problem JP Arnaout, G Rabadi, JH Mun International Journal of Operations Research 3 (2), 2006 | 26 | 2006 |
Solving the multiple level warehouse layout problem using ant colony optimization JP Arnaout, C ElKhoury, G Karayaz Operational Research 20, 473-490, 2020 | 24 | 2020 |
A practical decentralized access protocol for autonomous vehicles at isolated under-saturated intersections J Khoury, J Khoury, G Zouein, JP Arnaout Journal of Intelligent Transportation Systems 23 (5), 427-440, 2019 | 20 | 2019 |
Port Recovery from Security Incidents: A Simulation Approach, IN: Bichou, Bell & Evans: Risk Management in Port Operations, Logistics and Supply Chain Security. G Rabadi, CA Pinto, W Talley, JP Arnaout INFORMA/Lloyd’s List Publishing, London, UK., 2007 | 16* | 2007 |
Worm optimization for the multiple level warehouse layout problem JP Arnaout Annals of Operations Research 269 (1), 29-51, 2018 | 15 | 2018 |
Heuristics for the two‐machine scheduling problem with a single server JP Arnaout International Transactions in Operational Research 24 (6), 1347-1355, 2017 | 14 | 2017 |
Minimizing the total weighted completion time on unrelated parallel machines with stochastic times JPM Arnaout, G Rabadi Proceedings of the Winter Simulation Conference, 2005., 7 pp., 2005 | 14 | 2005 |