Follow
Damien Prot
Damien Prot
Talend
Verified email at talend.com - Homepage
Title
Cited by
Cited by
Year
A constraint-based approach for the Shift Design Personnel Task Scheduling Problem with equity
T Lapègue, O Bellenguez-Morineau, D Prot
Computers & Operations Research 40 (10), 2450–2465, 2013
492013
A survey on how the structure of precedence constraints may change the complexity class of scheduling problems
D Prot, O Bellenguez-Morineau
Journal of Scheduling 21 (1), 3-16, 2018
402018
A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective
D Prot, T Lapegue, O Bellenguez-Morineau
International Journal of Production Research 53 (24), 7286-7298, 2015
322015
New complexity results for parallel identical machine scheduling problems with preemption, release dates and regular criteria
D Prot, O Bellenguez-Morineau, C Lahlou
European Journal of Operational Research 231 (2), 282-287, 2013
282013
Tabu search and lower bound for an industrial complex shop scheduling problem
D Prot, O Bellenguez-Morineau
Computers & Industrial Engineering 62 (4), 1109-1118, 2012
152012
The scheduling zoo
C Dürr, S Knust, D Prot, ÓC Vásquez
URL http://www-desir. lip6. fr/~ durrc/query, 2013
142013
A Tour Scheduling Problem with Fixed Jobs: use of Constraint Programming
T Lapègue, D Prot, O Bellenguez-Morineau
Practice and Theory of Automated Timetabling, 2012
102012
Approximations for the Two-Machine Cross-Docking Flow Shop Problem
D Prot, C Rapine
Discrete Applied Mathematics 161 (13-14), 2107-2119, 2013
92013
A note on {\ mathbb {NP}}-hardness of preemptive mean flow-time scheduling for parallel machines
O Bellenguez-Morineau, M Chrobak, C Dürr, D Prot
Journal of Scheduling 18 (3), 299-304, 2015
72015
A 4D-sequencing approach for Air Traffic Management
D Prot, C Rapine, S Constans, R Fondacci
European Journal of Operational Research 237 (2), 411-425, 2014
72014
Using graph concepts to assess the feasibility of a sequenced air traffic flow with low conflict rate
D Prot, C Rapine, S Constans, R Fondacci
European Journal of Operational Research 207 (1), 184-196, 2010
72010
Overview on methods for the Shift Design and Personnel Task Scheduling Problem with Equity objective
T Lapègue, O Bellenguez-Morineau, D Prot
MOSIM 2014, 10ème Conférence Francophone de Modélisation, Optimisation et …, 2014
42014
Complexité de problèmes d'ordonnancement de rencontres de type speed-dating
A Le Roux, O Bellenguez-Morineau, C Guéret, D Prot
Roadef 2012, 2012
32012
Complexity of a one-to-one meeting scheduling problem with two types of actors
A Le Roux, O Bellenguez-Morineau, C Guéret, D Prot
Journal of the Operational Research Society, 2015
22015
Ordonnancement de personnel avec affectation de tâches: un modèle mathématique
T Lapègue, D Prot, O Bellenguez-Morineau
Roadef 2013, 2013
22013
Lower bounds for a Fixed Job Scheduling Problem with an equity objective function
D Prot, T Lapègue, O Bellenguez-Morineau
25th EURO Conference, 2012, 2012
22012
A note on the paper “Minimizing total tardiness on parallel machines with preemptions” by Kravchenko and Werner (2012)
D Prot, O Bellenguez-Morineau, C Lahlou
Journal of Scheduling 16 (4), 437-438, 2013
12013
Un nouveau système de trafic aérien à taux de conflits potentiels et consommation énergétique réduits
D Prot
12009
Une approche robuste pour la minimisation des risques de conflits aériens
D Prot, C Rapine, S Constans, R Fondacci
Roadef 2007, 2007
12007
A large neighborhood search for the Shift Design Personnel Task Scheduling Problem with Equity
T Lapègue, D Prot, O Bellenguez-Morineau
6th Multidisciplinary International Conference on Scheduling: Theory and …, 0
1*
The system can't perform the operation now. Try again later.
Articles 1–20