Follow
Hani ALzraiee, Ph.D, PE
Title
Cited by
Cited by
Year
Contractor selection model for highway projects using integrated simulation and analytic network process
MS El-Abbasy, T Zayed, M Ahmed, H Alzraiee, M Abouhamad
Journal of construction engineering and management 139 (7), 755-767, 2013
1022013
Dynamic planning of construction activities using hybrid simulation
H Alzraiee, T Zayed, O Moselhi
Automation in Construction 49, 176-192, 2015
832015
Condition prediction for cured-in-place pipe rehabilitation of sewer mains
I Bakry, H Alzraiee, ME Masry, K Kaddoura, T Zayed
Journal of Performance of Constructed Facilities 30 (5), 04016016, 2016
362016
Condition prediction for chemical grouting rehabilitation of sewer networks
I Bakry, H Alzraiee, K Kaddoura, M El Masry, T Zayed
Journal of Performance of Constructed Facilities 30 (6), 04016042, 2016
332016
Detecting of pavement marking defects using faster R-CNN
H Alzraiee, A Leal Ruiz, R Sprotte
Journal of Performance of Constructed Facilities 35 (4), 04021035, 2021
292021
A hybrid framework for modeling construction operations using discrete event simulation and system dynamics
H Alzraiee, O Moselhi, T Zayed
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
262012
Destructive analysis-based testing for cured-in-place pipe
H Alzraiee, I Bakry, T Zayed
Journal of Performance of Constructed Facilities 29 (4), 04014095, 2015
172015
Cost estimate system using structured query language in BIM
H Alzraiee
International Journal of Construction Management 22 (14), 2731-2743, 2022
152022
Methodology for synchronizing discrete event simulation and system dynamics models
H Alzraiee, T Zayed, O Moselhi
Proceedings of the 2012 Winter Simulation Conference (WSC), 1-11, 2012
142012
Hybrid simulation for construction operations
HSH Alzraiee
Concordia University, 2013
112013
Assessment of construction operations productivity rate as computed by simulation models
H Alzraiee, T Zayed, O Moselhi
2013 Winter Simulations Conference (WSC), 3225-3236, 2013
92013
A retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation technique used in municipal sewers
H Alzraiee, I Bakry, T Zayed
No-Dig, 2013
82013
A retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation technique used in municipal sewers
T Alzraiee, H., Bakry, I., Zayed
NASTT No Dig, 1-9, 2013
8*2013
Quantitative analysis of construction labor acceptance of wearable sensing devices to enhance workers' safety
H Fugate, H Alzraiee
Results in Engineering 17, 100841, 2023
72023
Dynamic planning of earthmoving projects using system dynamics
H Alzraiee, O Moselhi, T Zayed
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2012
62012
Case Study: Assessing the structural condition of steel bridges using Terrestrial Laser Scanner (TLS)
L Psomas, R Trainor, H Alzraiee
Construction Research Congress 2022, 433-442, 2022
52022
A framework for cost estimation using BIM object parameters
MT Clark, HS Alzraiee
Proceedings, Annual Conference-Canadian Society for Civil Engineering. Laval, 2019
52019
Quality Control for Concrete Steel Embed Plates using LiDAR and Point Cloud Mapping
H Alzraiee, R Sprotte, AL Ruiz
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2020
42020
Integrating BIM and Earned Value Management System to Measure Construction Progress
H Alzraiee
Construction Research Congress 2018, 684-693, 2018
42018
Digital Safety Planning and Monitoring in Highway Construction Projects
TH Goh, HS Alzraiee
Construction Research Congress 2022, 307-313, 2022
22022
The system can't perform the operation now. Try again later.
Articles 1–20