Follow
Xiangyu Wang
Title
Cited by
Cited by
Year
A Critical Review of Virtual and Augmented Reality (VR/AR) Applications in Construction Safety
X Li, W Yi, HL Chi, X Wang, APC Chan
Automation in Construction 86, 150-162, 2018
11022018
A Critical Review of the Use of 3D Printing in the Construction Industry
P Wu, J Wang, X Wang
Automation in Construction 68, 21-31, 2016
10652016
A theoretical framework of a BIM-based multi-disciplinary collaboration platform
V Singh, N Gu, X Wang
Automation in construction 20 (2), 134-144, 2011
9262011
Construction and demolition waste management in China through the 3R principle
B Huang, X Wang, H Kua, Y Geng, R Bleischwitz, J Ren
Resources, Conservation and Recycling 129, 36-44, 2018
9152018
A critical review of the use of virtual reality in construction engineering education and training
P Wang, P Wu, J Wang, HL Chi, X Wang
International journal of environmental research and public health 15 (6), 1204, 2018
8232018
Research Trend and Opportunities of Augmented Reality Applications in Architecture, Engineering and Construction
HL Chi, S Kang, X Wang
Automation in Construction 33, 116-122, 2013
6252013
A comprehensive survey of augmented reality assembly research
X Wang, SK Ong, AYC Nee
Advances in Manufacturing 4, 1-22, 2016
5492016
A Framework for Proactive Construction Defect Management using BIM, Augmented Reality and Ontology-based Data Collection Template
C Park, D Lee, O Kwon, X Wang
Automation in Construction 33, 61-71, 2013
4752013
The Outlook of Blockchain Technology for Construction Engineering and Management
J Wang, P Wu, X Wang
Frontiers of Engineering Management 4, 67-75, 2017
4552017
A State-of-the-Art Review on the Integration of Building Information Modelling (BIM) and Geographic Information System (GIS)
X Liu, X Wang, G Wright, JCP Cheng, X Li, R Liu
International Journal of Geo-Information 6 (2), 53. doi:http://dx.doi.org/10 …, 2017
4472017
A Mixed Review of the Adoption of Building Information Modelling (BIM) for Sustainability
CY Lee, H Chong, X Wang
Journal of Cleaner Production 142, 4114–4126, 2017
4382017
Augmented Reality in built environment: Classification and implications for future research
X Wang, MJ Kim, PED Love, SC Kang
Automation in construction 32, 1-13, 2013
4052013
Distributed finite-time containment control for double-integrator multiagent systems
X Wang, S Li, P Shi
IEEE Transactions on Cybernetics 44 (9), 1518-1528, 2013
3812013
CoFe2O4/N-doped reduced graphene oxide aerogels for high-performance microwave absorption
X Wang, Y Lu, T Zhu, S Chang, W Wang
Chemical Engineering Journal 388, 124317, 2020
3752020
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
X Li, P Wu, GQ Shen, X Wang, Y Teng
Automation in Construction 84, 195-206, 2017
3662017
A conceptual framework for integrating building information modeling with augmented reality
X Wang, PED Love, MJ Kim, CS Park, CP Sing, L Hou
Automation in construction 34, 37-44, 2013
3642013
Finite-time consensus and collision avoidance control algorithms for multiple AUVs
S Li, X Wang
Automatica 49 (11), 3359-3367, 2013
3632013
Computer vision techniques in construction: a critical review
S Xu, J Wang, W Shou, T Ngo, AM Sadick, X Wang
Archives of Computational Methods in Engineering 28, 3383-3397, 2021
3422021
Long-distance continuous-variable quantum key distribution over 202.81 km of fiber
Y Zhang, Z Chen, S Pirandola, X Wang, C Zhou, B Chu, Y Zhao, B Xu, ...
Physical review letters 125 (1), 010502, 2020
3392020
Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry
X Wang, M Truijens, L Hou, Y Wang, Y Zhou
Automation in construction 40, 96-105, 2014
3142014
The system can't perform the operation now. Try again later.
Articles 1–20