关注
Miguel A. Ortega-Vazquez
Miguel A. Ortega-Vazquez
Principal Project Manager, Electric Power Research Institute
在 epri.com 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Estimating the spinning reserve requirements in systems with significant wind power generation penetration
MA Ortega-Vazquez, DS Kirschen
IEEE Transactions on power systems 24 (1), 114-124, 2008
8852008
Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swapping Station
MR Sarker, H Pandzic, MA Ortega-Vazquez
IEEE Transactions on Power Systems, 2014
3502014
Optimal scheduling of electric vehicle charging and vehicletogrid services at household level including battery degradation and price uncertainty
MA OrtegaVazquez
IET Generation, Transmission & Distribution 8 (6), 1007-1016, 2014
3472014
Optimizing the spinning reserve requirements using a cost/benefit analysis
MA Ortega-Vazquez, DS Kirschen
IEEE Transactions on Power Systems 22 (1), 24-33, 2007
3182007
Electric Vehicle Aggregator/System Operator Coordination for Charging Scheduling and Services Procurement
MA Ortega-Vazquez, F Bouffard, V Silva
IEEE Transactions on Power Systems 28 (1), 1806-1815, 2013
3162013
Optimal Participation of an Electric Vehicle Aggregator in Day-Ahead Energy and Reserve Markets
MR Sarker, Y Dvorkin, MA Ortega-Vazquez
IEEE Transactions on Power Systems, 2016
2902016
Optimal coordination and scheduling of demand response via monetary incentives
MR Sarker, MA Ortega-Vazquez, DS Kirschen
IEEE Transactions on Smart Grid 6 (3), 1341-1352, 2014
2252014
A hybrid stochastic/interval approach to transmission-constrained unit commitment
Y Dvorkin, H Pandžić, MA Ortega-Vazquez, DS Kirschen
IEEE Transactions on Power Systems 30 (2), 621-631, 2014
1922014
Assessing flexibility requirements in power systems
Y Dvorkin, DS Kirschen, MA OrtegaVazquez
IET Generation, Transmission & Distribution 8 (11), 1820-1830, 2014
1442014
Assessing the impact of wind power generation on operating costs
MA Ortega-Vazquez, DS Kirschen
IEEE Transactions on Smart Grid 1 (3), 295-301, 2010
1302010
Participation of an energy storage aggregator in electricity markets
JE Contreras-Ocana, MA Ortega-Vazquez, B Zhang
IEEE Transactions on Smart Grid 10 (2), 1171-1183, 2017
1132017
The value of operational flexibility in power systems with significant wind power generation
F Bouffard, M Ortega-Vazquez
2011 IEEE Power and Energy Society General Meeting, 1-5, 2011
1062011
Electric Vehicle Battery Swapping Station: Business Case and Optimization Model
MR Sarker, H Pandzic, MA Ortega-Vazquez
2013 International Conference on Connected Vehicles and Expo (ICCVE), 289-294, 2013
962013
Co-Optimization of Distribution Transformer Aging and Energy Arbitrage Using Electric Vehicles
MR Sarker, DJ Olsen, MA Ortega-Vazquez
IEEE Transactions on Smart Grid, 2016
902016
Optimal carbon taxes for emissions targets in the electricity sector
DJ Olsen, Y Dvorkin, R Fernández-Blanco, MA Ortega-Vazquez
IEEE Transactions on Power Systems 33 (6), 5892-5901, 2018
822018
Optimizing the spinning reserve requirements
MA Ortega-Vazquez
University of Manchester, 2006
76*2006
Optimal operation of a battery energy storage system: Trade-off between grid economics and storage health
MR Sarker, MD Murbach, DT Schwartz, MA Ortega-Vazquez
Electric Power Systems Research 152, 342-349, 2017
742017
Optimal operation of aggregated electric vehicle charging stations coupled with energy storage
MR Sarker, H Pandžić, K Sun, MA OrtegaVazquez
IET Generation, Transmission & Distribution 12 (5), 1127-1136, 2018
712018
Wind generation as reserve provider
Y Dvorkin, MA Ortega-Vazuqez, DS Kirschen
IET GENERATION TRANSMISSION & DISTRIBUTION 9 (8), 788-788, 2015
702015
Optimising the scheduling of spinning reserve considering the cost of interruptions
MA Ortega-Vazquez, DS Kirschen, D Pudjianto
IEE Proceedings-Generation, Transmission and Distribution 153 (5), 570-575, 2006
702006
系统目前无法执行此操作,请稍后再试。
文章 1–20