Hung-Lin Chi
Title
Cited by
Cited by
Year
Research trends and opportunities of augmented reality applications in architecture, engineering, and construction
HL Chi, SC Kang, X Wang
Automation in construction 33, 116-122, 2013
3622013
A critical review of virtual and augmented reality (VR/AR) applications in construction safety
X Li, W Yi, HL Chi, X Wang, APC Chan
Automation in Construction 86, 150-162, 2018
2752018
A critical review of the use of virtual reality in construction engineering education and training
P Wang, P Wu, J Wang, HL Chi, X Wang
International journal of environmental research and public health 15 (6), 1204, 2018
1732018
Use of tangible and augmented reality models in engineering graphics courses
YC Chen, HL Chi, WH Hung, SC Kang
Journal of Professional Issues in Engineering Education & Practice 137 (4 …, 2011
1512011
A comprehensive analysis of the credits obtained by LEED 2009 certified green buildings
P Wu, Y Song, W Shou, H Chi, HY Chong, M Sutrisna
Renewable and Sustainable Energy Reviews 68, 370-379, 2017
892017
Three-dimensional simulation and visualization of crane assisted construction erection processes
SC Kang, HL Chi, E Miranda
Journal of Computing in Civil Engineering 23 (6), 363-371, 2009
722009
BIM-enabled structural design: impacts and future developments in structural modelling, analysis and optimisation processes
HL Chi, X Wang, Y Jiao
Archives of computational methods in engineering 22 (1), 135-151, 2015
622015
A linked data system framework for sharing construction defect information using ontologies and BIM environments
DY Lee, H Chi, J Wang, X Wang, CS Park
Automation in Construction 68, 102-113, 2016
592016
Reference tag supported RFID tracking using robust support vector regression and Kalman filter
J Chai, C Wu, C Zhao, HL Chi, X Wang, BWK Ling, KL Teo
Advanced Engineering Informatics 32, 1-10, 2017
542017
Development of user interface for tele-operated cranes
HL Chi, YC Chen, SC Kang, SH Hsieh
Advanced Engineering Informatics 26 (3), 641-652, 2012
522012
A framework of innovative learning for skill development in complex operational tasks
L Hou, HL Chi, W Tarng, J Chai, K Panuwatwanich, X Wang
Automation in Construction 83, 29-40, 2017
342017
Mathematical programming models for construction site layout problems
W Yi, HL Chi, S Wang
Automation in construction 85, 241-248, 2018
282018
A physics-based simulation approach for cooperative erection activities
HL Chi, SC Kang
Automation in construction 19 (6), 750-761, 2010
282010
Attention-based user interface design for a tele-operated crane
YC Chen, HL Chi, SC Kang, SH Hsieh
Journal of computing in civil engineering 30 (3), 04015030, 2016
232016
A smart crane operations assistance system using augmented reality technology
YC Chen, HL Chi, SC Kangm, SH Hsieh
Proceedings of 28th international symposium on automation and robotics in …, 2011
212011
Automation and robotics in construction and civil engineering
MJ Kim, HL Chi, X Wang, L Ding
Journal of Intelligent & Robotic Systems 79 (3-4), 347, 2015
172015
Spatial and temporal analysis on the distribution of active radio-frequency identification (RFID) tracking accuracy with the kriging method
X Liu, J Shannon, H Voun, M Truijens, HL Chi, X Wang
Sensors 14 (11), 20451-20467, 2014
172014
Psychological and demographic factors affecting household energy-saving intentions: a TPB-based study in Northwest China
X Liu, Q Wang, HH Wei, HL Chi, Y Ma, IY Jian
Sustainability 12 (3), 836, 2020
152020
Simulation system for a construction crane and the simulation method thereof
S Kang, H Chi, W Hung
US Patent 8,014,982, 2011
152011
Automatic as-built modeling for concurrent progress tracking of plant construction based on laser scanning
J Chai, HL Chi, X Wang, C Wu, KH Jung, JM Lee
Concurrent Engineering 24 (4), 369-380, 2016
142016
The system can't perform the operation now. Try again later.
Articles 1–20