Follow
Reidar Lunde Lillestøl
Reidar Lunde Lillestøl
Unknown affiliation
Verified email at lillestol.no
Title
Cited by
Cited by
Year
The compact linear collider (CLIC)-2018 summary report
T CLIC, TK Charles, PJ Giansiracusa, TG Lucas, RP Rassool, M Volpi, ...
arXiv preprint arXiv:1812.06018, 2018
1682018
Updated baseline for a staged Compact Linear Collider
MJ Boland, U Felzmann, PJ Giansiracusa, TG Lucas, RP Rassool, ...
1522016
Updated baseline for a staged Compact Linear Collider
T CLIC, MJ Boland, U Felzmann, PJ Giansiracusa, TG Lucas, RP Rassool, ...
arXiv preprint arXiv:1608.07537, 2016
322016
The CLIC feasibility demonstration in CTF3
P Skowronski, J Barranco, S Bettoni, R Corisni, M Divall Csatari, ...
2nd International Particle Accelerator Conference, IPAC2011, 4th to 9th …, 2011
182011
Status of wakefield monitor experiments at the CLIC Test Facility
R Lillestøl, A Grudiev, W Wuensch, N Aftab, E Adli, S Döbert, R Corsini, ...
122016
Power production experiments at the Test Beam Line in the CLIC Test Facility 3
RL Lillestøl
Institutt for elektronikk og telekommunikasjon, 2010
122010
Beam profile monitoring at the test beam line at the Compact Linear Collider test facility
M Olvegård, E Adli, W Andreazza, B Bolzon, E Bravin, N Chritin, ...
Physical Review Special Topics-Accelerators and Beams 16 (8), 082802, 2013
92013
Experimental Results from the Test Beam Line in the CLIC Test Facility 3
R Lillestol, S Doebert, M Olvegaard, E Adli
TUPWA046, IPAC2013, 2013
92013
Experimental program for the CLIC Test Facility 3 test beam line
E Adli, AE Dabrowski, D Schulte, S Dobert, I Syratchev, M Olvegaard, ...
92010
Electron beam deceleration measurements using the decelerator test beam line in the Compact Linear Collider test facility
RL Lillestøl, S Döbert, E Adli, M Olvegård
Physical Review Special Topics-Accelerators and Beams 17 (3), 031003, 2014
52014
The CLIC Wake Field Monitor Study
RL Lillestol
32017
Wakefield Monitor Experiments with X-Band Accelerating Structures
R Lillestøl, L Malina, W Wuensch, J Pfingstner, E Adli, S Döbert, R Corsini, ...
22015
Experimental verification of the CLIC decelerator with the Test Beam Line in the CLIC Test Facility 3
RL Lillestøl, S Dӧbert, G Sterbini, M Olvegård, AN Rabiller, E Adli
Conf. Proc. 1205201 (CERN-ATS-2012-124), TUPPR031, 2012
22012
Beam-based alignment in CTF3 Test Beam Line
G Sterbini, S Dӧbert, E Adli, D Schulte, RL Lillestol, E Marín
Conf. Proc. 1205201 (CERN-ATS-2012-144), TUPPR034, 2012
22012
Commissioning status of the decelerator test beam line in CTF3
E Adli, F Toral, Y Kubyshin, JJ Garcia-Garrigos, R Lillestol, G Montoro, ...
22010
Commissioning Status of the Decelerator Test Beam Line in CTF3
S Döbert, E Adli, RL Lillestol, M Olvegård, I Syratchev
22010
Collective effects and experimental verification of the CLIC drive beam and decelerator
RL Lillestøl
12014
Deceleration measurements of an electron beam in the CLIC Test Facility 3
R Lillestøl, S Döbert, E Adli
12014
Longitudinal space charge effects in the clic drive beam
RL Lillestol, E Adli, D Schulte, A Latina, S Doebert, KN Sjobak
12013
EXPERIMENTAL VERIFICTION OF THE CLIC TWO-BEAM ACCELERATION TECHNOLOGY IN CTF3
B Constance, A Andersson, J Barranco, R Corsini, S Doebert, ...
The International Particle Accelerator Conference, 2013
1*2013
The system can't perform the operation now. Try again later.
Articles 1–20