Follow
Hamidreza Kia
Hamidreza Kia
Assistant Professor of Industrial Engineering,Islamic Azad University- South Tehran Branch
Verified email at azad.ac.ir - Homepage
Title
Cited by
Cited by
Year
Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis
H Kia, H Davoudpour, M Zandieh
International Journal of Production Research 48 (14), 4019-4042, 2010
402010
Vehicle routing and scheduling in cross docks with forward and reverse logistics
Y Kaboudani, SH Ghodsypour, H Kia, A Shahmardan
Operational Research 20, 1589-1622, 2020
342020
New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
H Kia, SH Ghodsypour, H Davoudpour
Journal of Industrial Engineering International 13, 297-306, 2017
152017
A hybrid imperialist competitive algorithm for solving economic lot and delivery scheduling problem in a four-stage supply chain
H Kia, SH Ghodsypour, H Davoudpour
Advances in mechanical engineering 9 (2), 1687814016686893, 2017
72017
A hybrid metaheuristic approach for solving a bi-objective capacitated electric vehicle routing problem with time windows and partial recharging
F Zahedi, H Kia, M Khalilzadeh
Journal of Advances in Management Research 20 (4), 695-729, 2023
52023
Design of a Pharmaceutical supply chain under uncertainty and reverse logistic
D Foroughi, H Kia
Journal of Transportation Research, 2022
12022
Sustainable multi-objective two-echelon capacitated vehicle routing problem with simultaneous pickup and delivery for perishable products
R Shokri Busjin, H Kia
Journal of Transportation Research, 2022
2022
A Hybrid Algorithm for Solving Economic Lot and Delivery Scheduling Problems in a Three-echelon Supply Chain
H Kia, SH Ghodsypour, H Davoudpour, C O'Brien
Proceeding of the 19th International Working Seminar on Production Economics …, 2016
2016
A simulation analysis for solving multi-objective dynamic flexible flow line problem with sequence-dependent setup times by evolving scheduling rules using gentic programming
H Kia, SH Ghodsypour, H Davoudpour, C O'Brien
Proceeding of the 17th International Working Seminar on Production Economics …, 2012
2012
Upper lomit for the consistency in Group Decision-Making using AHP
H Kia, SH Ghodsypour, C O'Brien
Proceeding of the 17th International Working Seminar on Production Economics …, 2012
2012
An experimental study of scheduling a dynamic hybrid flow shop with sequence-dependent setup times
SMT Fatemi Ghomi, H Kia
Proceeding of the 3th Iranian Opreation Research conference, Amirkabir …, 2010
2010
Comparing Two Replenishment Policy for Solving Economic Lot and Delivery Scheduling Problems in a Three-echelon Supply Chain
H Kia, SH Ghodsypour
The system can't perform the operation now. Try again later.
Articles 1–12