Follow
Najat Almasarwah
Najat Almasarwah
Assistant Professor of Industrial Systems Engineering, Mutah University
Verified email at mutah.edu.jo - Homepage
Title
Cited by
Cited by
Year
Cellular manufacturing design 1996–2021: A review and introduction to applications of Industry 4.0
R YounesSinaki, A Sadeghi, H Mosadegh, N Almasarwah, G Suer
International Journal of Production Research 61 (16), 5585-5636, 2023
182023
Flexible flowshop design in cellular manufacturing systems
N Almasarwah, G Süer
Procedia Manufacturing 39, 991-1001, 2019
132019
Minimizing the number of tardy jobs on identical parallel machines subject to periodic maintenance
A Najat, C Yuan, S Gursel, Y Tao
Procedia Manufacturing 38, 1409-1416, 2019
132019
A two-phase algorithm to solve a 3-dimensional pallet loading problem
M Singh, N Almasarwah, G Süer
Procedia Manufacturing 39, 1474-1481, 2019
122019
Consideration of processing time dissimilarity in batch-cyclic scheduling of flowshop cells
N Almasarwah, GA Süer
International Journal of Production Research 59 (21), 6544-6563, 2021
102021
Application of Machine Learning Methods for Pallet Loading Problem
BL Aylak, M İnce, O Oral, G Süer, N Almasarwah, M Singh, B Salah
Applied Sciences 11 (18), 8304, 2021
92021
Product Scheduling in a Flowshop Cell
N Almasarwah, G Süer
Procedia Manufacturing 17, 206-213, 2018
82018
Assembly System 4.0: Human-Robot Collaboration in Assembly Operations
GA Suer, N Almasarwah, J Pagan, Y You
IFIP International Conference on Advances in Production Management Systems …, 2021
72021
Collaborative robots’ assembly system in the manufacturing area, assembly system 4.0
N Almasarwah, E Abdelall, GA Suer, J Pagan, Y You
The International Journal of Advanced Manufacturing Technology 122 (2), 1069 …, 2022
62022
Multi-objective scheduling in labor-intensive manufacturing systems
G Süer, N Almasarwah, O Alhawari, C Davis
Journal of Manufacturing Systems 57, 469-483, 2020
32020
Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems
N Almasarwah, G Suer
Computers and Industrial Engineering Conference, 2017
32017
Multi-Stage Cellular Manufacturing System Design under Certain and Uncertain Conditions
NE Almasarwah
Ohio University, 2020
22020
Pallet loading optimization considering storage time and relative humidity
N Almasarwah, E Abdelall, G Suer, G Egilmez, M Singh, S Ramadan
Journal of Industrial Engineering and Management 16 (2), 453-471, 2023
12023
Minimizing Average Flow Time subject to Minimum Number of Cells and No Tardy Jobs
G Suer, N Al-masarwah, O Alhawari, C Davis
ACMSA Conference, 2017
12017
Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems
NE Almasarwah
Ohio University, 2017
12017
AN INVESTIGATION OF ACTIVITY TRACKERS’ POTENTIAL HARMFUL IMPACTS ON MENTAL HEALTH AND FACTORS CONTROLLING USER INTENTION FOR ADOPTABILITY
ANDSB ESRAA S. ABDELALL, NAJAT ALMASARWAH , RICHARD T. STONE, FATIMA MGAEDEH ...
50th International Conference on Computers and Industrial Engineering …, 2023
2023
JOB SHOP BATCH-CYCLIC SCHEDULING METHOD IN THE MANUFACTURING AREA
N ALMASARWAH, E ABDELALL, AA ALSARAYREH
50th International Conference on Computers and Industrial Engineering …, 2023
2023
An Accurate and Robust Genetic Algorithm to Minimize the Total Tardiness in Parallel Machine Scheduling Problems
SZ Ramadan, N Almasarwah, ES Abdelall, GA Suer, NT Albashabsheh
Management and Production Engineering Review 14, 2023
2023
Human-Cyber-Physical Disassembly Workstation 5.0 for Sustainable Manufacturing
N Almasarwah, E Abdelall, M Saraireh, S Ramadan
2022 International Conference on Emerging Trends in Computing and …, 2022
2022
Collaborative Robots’ Assembly System in the Manufacturing Area Considering the Safety Issue, Assembly System 4.0
N Almasarwah, G Suer, E Abdelall, J Pagan, Y You
2022
The system can't perform the operation now. Try again later.
Articles 1–20