Chengke Wu
Chengke Wu
Verified email at postgrad.curtin.edu.au
Title
Cited by
Cited by
Year
A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation
R Jiang, C Mao, L Hou, C Wu, J Tan
Journal of Cleaner Production 173, 225-234, 2018
792018
Overview of BIM maturity measurement tools
C Wu, B Xu, C Mao, X Li
Journal of Information Technology in Construction (ITcon) 22 (3), 34-62, 2017
492017
Critical review of data-driven decision-making in bridge operation and maintenance
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Structure and Infrastructure Engineering, 1-24, 2020
442020
Ontological knowledge base for concrete bridge rehabilitation project management
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Automation in Construction 121, 103428, 2021
182021
Ecosystem visualization and analysis of Chinese prefabricated housing industry
R Jiang, C Wu, C Mao, A Shrestha
Procedia Engineering 145, 436-443, 2016
172016
SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production
X Li, C Wu, P Wu, L Xiang, GQ Shen, S Vick, CZ Li
Journal of Cleaner Production 239, 117991, 2019
72019
Understanding laborers’ behavioral diversities in multinational construction projects using integrated simulation approach
C Wu, C Chen, R Jiang, P Wu, B Xu, J Wang
Engineering, Construction and Architectural Management, 2019
62019
Estimating carbon emissions from road use, maintenance and rehabilitation through a hybrid life cycle assessment approach–A case study
R Jiang, C Wu, Y Song, P Wu
Journal of Cleaner Production 277, 123276, 2020
32020
基于 BIM 的工程管理专业毕业设计改革——以重庆大学为例
李世蓉, 吴承科, 李骁
工程经济 8, 2016
22016
An Evaluation of Project Management System of Public Construction Sector in Shenzhen, China
C Wu, X Li, S Li, B Xu
Proceedings of the 20th International Symposium on Advancement of …, 2017
12017
Integration of BIM and computer simulations in modular construction, A case study
C Wu, R Jiang, X Li
Modular and Offsite Construction (MOC) Summit Proceedings, 2016
12016
Selecting the optimal network-level pavement maintenance budget scenario based on sustainable considerations
R Jiang, P Wu, C Wu
Transportation Research Part D: Transport and Environment 97, 102919, 2021
2021
Hybrid deep learning model for automating constraint modelling in advanced working packaging
C Wu, X Wang, P Wu, J Wang, R Jiang, M Chen, M Swapan
Automation in Construction 127, 103733, 2021
2021
Developing a hybrid approach to extract constraints related information for constraint management
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Automation in Construction 124, 103563, 2021
2021
Government efforts and roadmaps for building information modeling implementation: lessons from Singapore, the UK and the US
R Jiang, C Wu, X Lei, A Shemery, KD Hampson, P Wu
Engineering, Construction and Architectural Management, 2021
2021
Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach
C Wu, P Wu, R Jiang, J Wang, X Wang, M Wan
Engineering, Construction and Architectural Management, 2020
2020
Ontological Base for Concrete Bridge Rehabilitation Projects
C Wu, R Jiang, J Wang, J Huang, X Wang
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2020
2020
Developing Roadmaps for the Mandatory Use of Building Information Modeling: Lessons from Singapore and the UK
R Jiang, C Wu, X Lei, P Wu, W Shou
International Symposium on Advancement of Construction Management and Real …, 2019
2019
基于仿真技术的国际建设工程现场人员行为差异及其影响研究
吴承科
重庆大学, 2018
2018
基于 DEA 的 BIM-IPD 项目利益协同系统研究
李骁, 沈岐平, 吴承科, 洪竞科, 徐波
收藏 5, 2017
2017
The system can't perform the operation now. Try again later.
Articles 1–20