关注
VAHID EBRAHIMIPOUR
VAHID EBRAHIMIPOUR
Chevron, Reliability Optimization & Asset Integrity Management
在 chevron.com 的电子邮件经过验证
标题
引用次数
引用次数
年份
A new method for quantitative assessment of resilience engineering by PCA and NT approach: A case study in a process industry
GA Shirali, I Mohammadfam, V Ebrahimipour
Reliability Engineering & System Safety 119, 88-94, 2013
1972013
A flexible algorithm for fault diagnosis in a centrifugal pump with corrupted data and noise based on ANN and support vector machine with hyper-parameters optimization
A Azadeh, M Saberi, A Kazem, V Ebrahimipour, A Nourmohammadzadeh, ...
Applied Soft Computing 13 (3), 1478-1485, 2013
1702013
An ontology approach to support FMEA studies
V Ebrahimipour, K Rezaie, S Shokravi
Expert Systems with Applications 37 (1), 671-677, 2010
1632010
A flexible neural network-fuzzy mathematical programming algorithm for improvement of oil price estimation and forecasting
A Azadeh, M Moghaddam, M Khakzad, V Ebrahimipour
Computers & Industrial Engineering 62 (2), 421-430, 2012
1362012
Improved estimation of electricity demand function by integration of fuzzy system and data mining approach
A Azadeh, M Saberi, SF Ghaderi, A Gitiforouz, V Ebrahimipour
Energy Conversion and Management 49 (8), 2165-2177, 2008
1322008
Challenges in building resilience engineering (RE) and adaptive capacity: A field study in a chemical plant
GHA Shirali, M Motamedzade, I Mohammadfam, V Ebrahimipour, ...
Process safety and environmental protection 90 (2), 83-90, 2012
1182012
A fuzzy inference system for pump failure diagnosis to improve maintenance process: The case of a petrochemical industry
A Azadeh, V Ebrahimipour, P Bavar
Expert Systems with Applications 37 (1), 627-639, 2010
1172010
A hybrid GA–PSO approach for reliability optimization in redundancy allocation problem
M Sheikhalishahi, V Ebrahimipour, H Shiri, H Zaman, M Jeihoonian
The International Journal of Advanced Manufacturing Technology 68, 317-338, 2013
1122013
Multi-objective modeling for preventive maintenance scheduling in a multiple production line
V Ebrahimipour, A Najjarbashi, M Sheikhalishahi
Journal of Intelligent Manufacturing 26, 111-122, 2015
822015
Assessment of resilience engineering factors based on system properties in a process industry
GA Shirali, M Motamedzade, I Mohammadfam, V Ebrahimipour, ...
Cognition, Technology & Work 18, 19-31, 2016
692016
An integrated approach for assessment and ranking of manufacturing systems based on machine performance
A Azadeh, V Ebrahimipour
International Journal of Industrial Engineering: Theory, Applications and …, 2004
682004
Assessing resilience engineering based on safety culture and managerial factors
GHA Shirali, I Mohammadfam, M Motamedzade, V Ebrahimipour, ...
Process Safety Progress 31 (1), 17-18, 2012
652012
An integrated approach for assessment of manufacturing sectors based on machine performance: the cases of automotive and food and beverages industrie
MA Azadeh, V Ebrahimipour
582002
Application of multi-objective particle swarm optimization to solve a fuzzy multi-objective reliability redundancy allocation problem
V Ebrahimipour, M Sheikhalishahi
2011 IEEE International Systems Conference, 326-333, 2011
422011
Ontology-based schema to support maintenance knowledge representation with a case study of a pneumatic valve
V Ebrahimipour, S Yacout
IEEE Transactions on Systems, Man, and Cybernetics: Systems 45 (4), 702-712, 2015
372015
An integrated PCA DEA framework for assessment and ranking of manufacturing systems based on equipment performance
A Azadeh, SF Ghaderi, V Ebrahimipour
Engineering Computations 24 (4), 347-372, 2007
362007
An integrated framework for continuous assessment and improvement of manufacturing systems
A Azadeh, SF Ghaderi, YP Miran, V Ebrahimipour, K Suzuki
Applied Mathematics and Computation 186 (2), 1216-1233, 2007
302007
An emotional learning-based fuzzy inference system for improvement of system reliability evaluation in redundancy allocation problem
V Ebrahimipour, SM Asadzadeh, A Azadeh
The International Journal of Advanced Manufacturing Technology 66, 1657-1672, 2013
282013
A total machine productivity model for assessment and improvement of electrical manufacturing systems
MA Azadeh, V Ebrahimipour, GR Ataei
32nd International Conference in Computers and Industrial Engineering …, 2003
282003
A GA–PCA approach for power sector performance ranking based on machine productivity
V Ebrahimipour, A Azadeh, K Rezaie, K Suzuki
Applied mathematics and computation 186 (2), 1205-1215, 2007
262007
系统目前无法执行此操作,请稍后再试。
文章 1–20