关注
Emile Zankoul
Emile Zankoul
ME Civil Engineering, American University of Beirut
在 aub.edu.lb 的电子邮件经过验证
标题
引用次数
引用次数
年份
How can ‘tasks made ready’during lookahead planning impact reliable workflow and project duration?
FR Hamzeh, E Zankoul, C Rouhana
Construction management and economics 33 (4), 243-258, 2015
972015
A New Perspective of Construction Logistics and Production Control: An Exploratory Study
M Ghanem, F Hamzeh, O Seppänen, E Zankoul
International Group for Lean Construction Conference, 992-1001, 2018
552018
Evaluation of agent-based and discrete-event simulation for modeling construction earthmoving operations
E Zankoul, H Khoury, R Awwad
ISARC. Proceedings of the international symposium on automation and robotics …, 2015
542015
Near-real-time optimization of overlapping tower crane operations: a model and case study
M Al Hattab, E Zankoul, FR Hamzeh
Journal of Computing in Civil Engineering 31 (4), 05017001, 2017
482017
Crane overlap and operational flexibility: balancing utilization, duration, and safety
M Al Hattab, E Zankoul, M Barakat, F Hamzeh
Construction Innovation 18 (1), 43-63, 2018
392018
Understanding the planner’s role in lookahead construction planning
H Abou-Ibrahim, F Hamzeh, E Zankoul, SM Lindhard, L Rizk
Production Planning & Control, 2018
352018
Removing Constraints to Make Tasks Ready in Weekly Work Planning
F Hamzeh, E Zankoul, F El Sakka
262016
Optimizing joint operation of two tower cranes through look-ahead planning and process simulation
M Al Hattab, E Zankoul, F Hamzeh
Proceedings 22nd Annual Conference of the International Group for Lean …, 2014
162014
Sensor-based planning tool for tower crane anti-collision monitoring on construction sites
JP Sleiman, E Zankoul, H Khoury, F Hamzeh
Construction Research Congress 2016, 2624-2632, 2016
142016
Modeling, animating, and optimizing on-shore wind farm construction operations
E Zankoul, H Khoury
Journal of Computing in Civil Engineering 30 (6), 05016001, 2016
132016
Simulation of on-shore wind farm construction process in lebanon
E Zankoul, H Khoury
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2014
122014
An Agent-Based Approach for Modeling the Effect of Learning Curve on Labor Productivity
H Shehwaro, E Zankoul, H Khoury
92016
CCC_implementing the construction control room on a fast-paced project: the case study of the Beirut port explosion
A Ezzeddine, L Shehab, I Srour, W Power, E Zankoul, E Freiha
International Journal of Construction Management 23 (5), 745-755, 2023
82023
Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective
M Ghanem, F Hamzeh, O Seppänen, L Shehab, E Zankoul
Frontiers in Built Environment 8, 980023, 2022
62022
A review on Internet of Things for enhancing construction equipment fleet productivity
E Zankoula, H Khourya, D Salhaba, S Antara
Proceedings of the Creative Construction Conference, 000-000, 2018
52018
Simulation, 5D Visualization and Optimization of On-shore Wind Farm Construction
E Zankoul
American University of Beirut, 2015
12015
系统目前无法执行此操作,请稍后再试。
文章 1–16